Page 13 - Preparing For Our Future Brochure
P. 13

Hudson High School

ADDING FLEXIBLE SPACE
IN THE MEDIA CENTER, AND
UPGRADING UTILITIES

Hudson High School opened its doors to
students in 1992. Twenty-five years later, it
stands as an example of the foresight of all
those who saw a need for this excellent facility.
However, much like any facility, the utilities
have shorter life spans. The Master Facility
Plan includes new heating and cooling for the
High School. To enhance student learning,
collaborative, flexible, and hands-on spaces will
be added by renovating the Media Center.

The interior of the Media Center will be redesigned and
renovated to include flexible, collaborative, and hands-on spaces
to enhance student learning today and in the future.

                                                                                                               13
   8   9   10   11   12   13   14   15   16   17   18