Page 10 - Preparing For Our Future Brochure
P. 10

East Woods & McDowell                               Maximizing the available space in both East Woods
                                                      and McDowell, renovating the building interiors, and
                           REALIGNING AND RENOVATING  adding classrooms and kitchen space to East Woods, will
                                                      allow our District to educate approximately 1,100 third,
                EAST WOODS AND MCDOWELL SITE PLAN     fourth, and fifth graders at East Woods. McDowell will be
10                                                    appropriately renovated for nearly 450 Pre-Kindergarten
                                                      and Kindergarten students. East Woods is currently air-
                                                      conditioned. With the implementation of the proposed
                                                      plan, McDowell will be fully air-conditioned as well.

                                                      Traffic and parking for East Woods and McDowell will be
                                                      significantly improved on the new Central Campus. New
                                                      traffic patterns for parking will separate car and bus traffic.
                                                      The new plan also provides for more onsite car pick-up
                                                      and drop-off of students, which will help reduce street
                                                      parking on North Hayden Parkway during peak traffic times.
                                                      Gates will be used in strategic locations to eliminate cut-
                                                      through traffic.

                                                      Walk and bike paths will provide safe routes for students,
                                                      with ample width to accommodate both pedestrians
                                                      and cyclists. The paths will connect from North Hayden
                                                      Parkway to North Oviatt Street, allowing students to easily
                                                      traverse the campus. Designated and clearly marked
                                                      crosswalks will be designed to increase safety.

                                                                     RENOVATIONS

                                                                   McDOWELL
                                                                   • R enovations to accommodate a

                                                                     PreK-K facility (450 student capacity)

                                                                   • Reconfigure parking and playgrounds

                                                                   EAST WOODS
                                                                   • C lassroom/kitchen additions/

                                                                     renovations to accommodate Grades 3-5
                                                                     (1,100 student capacity)

                                                                   SITE PLAN
                                                                   • Centralized bus unloading/loading area
                                                                   • Separate parent drop-off/pick-up areas
                                                                   • Parking expansion
                                                                   • Pedestrian/bicycle connectivity
   5   6   7   8   9   10   11   12   13   14   15