Page 10 - Preparing For Our Future Brochure
P. 10
East Woods & McDowell Maximizing the available space in both East Woods
and McDowell, renovating the building interiors, and
REALIGNING AND RENOVATING adding classrooms and kitchen space to East Woods, will
allow our District to educate approximately 1,100 third,
EAST WOODS AND MCDOWELL SITE PLAN fourth, and fifth graders at East Woods. McDowell will be
10 appropriately renovated for nearly 450 Pre-Kindergarten
and Kindergarten students. East Woods is currently air-
conditioned. With the implementation of the proposed
plan, McDowell will be fully air-conditioned as well.
Traffic and parking for East Woods and McDowell will be
significantly improved on the new Central Campus. New
traffic patterns for parking will separate car and bus traffic.
The new plan also provides for more onsite car pick-up
and drop-off of students, which will help reduce street
parking on North Hayden Parkway during peak traffic times.
Gates will be used in strategic locations to eliminate cut-
through traffic.
Walk and bike paths will provide safe routes for students,
with ample width to accommodate both pedestrians
and cyclists. The paths will connect from North Hayden
Parkway to North Oviatt Street, allowing students to easily
traverse the campus. Designated and clearly marked
crosswalks will be designed to increase safety.
RENOVATIONS
McDOWELL
• R enovations to accommodate a
PreK-K facility (450 student capacity)
• Reconfigure parking and playgrounds
EAST WOODS
• C lassroom/kitchen additions/
renovations to accommodate Grades 3-5
(1,100 student capacity)
SITE PLAN
• Centralized bus unloading/loading area
• Separate parent drop-off/pick-up areas
• Parking expansion
• Pedestrian/bicycle connectivity