Page 6 - Preparing For Our Future Brochure
P. 6
The Master Facility Plan T H E D E T A I L S
Our community has asked us to provide as much detail as possible about the plan. The design
concepts and renderings represent what we believe is close to a final plan. Additional opportunities
for input and planning will take place once financing is secured.
SITE SOLUTIONS AND DESIGN FEATURES PARKING AND TRAFFIC
• Constructing a new Middle School • Renovating the Ada Cooper MCDOWELL/EAST WOODS
on the Central Campus while Miller Natatorium for school and • Separate parent drop-off/pick-up
looking to repurpose the 1927 community use.
building. areas at respective schools
• Improving the Central Campus • Centralized bus unloading/
• Realigning grades and renovating by changing the traffic patterns,
McDowell for Preschool and separating cars and buses, and loading area
Kindergarten. Air-conditioning is designing safe routes for walking • Greater opportunity for onsite
an important component of the and biking. In addition, this plan
renovation. addresses a long-standing need car pick-up and drop-off
to reduce traffic build-up on • Separation of pedestrian and
• Realigning grades and renovating neighboring streets during peak
East Woods for grades three, four, pick-up and drop-off times. vehicular circulation
and five. • Relocated playground
• Repurposing Evamere’s 2007 • Improved parking
• Constructing an addition at addition and common facilities
Ellsworth Hill so the building can while downsizing the building EVAMERE
accommodate grades one and two. for District Office use and • Reduced traffic with District
Hudson Community Education
• Renovating the High School and Recreation (HCER) daytime Offices/HCER use
Media Center and replacing the community programming.
HVAC system. OVERALL CAMPUS
• Improved pedestrian/bicycle
connectivity to neighboring
community
6