The Master Facility Plan T H E D E T A I L S

Our community has asked us to provide as much detail as possible about the plan. The design
concepts and renderings represent what we believe is close to a final plan. Additional opportunities
for input and planning will take place once financing is secured.

SITE SOLUTIONS AND DESIGN FEATURES                                            PARKING AND TRAFFIC

•	Constructing a new Middle School    •	Renovating the Ada Cooper           MCDOWELL/EAST WOODS
   on the Central Campus while            Miller Natatorium for school and    •	Separate parent drop-off/pick-up
   looking to repurpose the 1927          community use.
   building.                                                                     areas at respective schools
                                       •	Improving the Central Campus        •	Centralized bus unloading/
•	Realigning grades and renovating       by changing the traffic patterns,
   McDowell for Preschool and             separating cars and buses, and         loading area
   Kindergarten. Air-conditioning is      designing safe routes for walking   •	Greater opportunity for onsite
   an important component of the          and biking. In addition, this plan
   renovation.                            addresses a long-standing need         car pick-up and drop-off
                                          to reduce traffic build-up on       •	Separation of pedestrian and
•	Realigning grades and renovating       neighboring streets during peak
   East Woods for grades three, four,     pick-up and drop-off times.            vehicular circulation
   and five.                                                                  •	Relocated playground
                                       •	Repurposing Evamere’s 2007          •	Improved parking
•	Constructing an addition at            addition and common facilities
   Ellsworth Hill so the building can     while downsizing the building       EVAMERE
   accommodate grades one and two.        for District Office use and         •	Reduced traffic with District
                                          Hudson Community Education
•	Renovating the High School             and Recreation (HCER) daytime          Offices/HCER use
   Media Center and replacing the         community programming.
   HVAC system.                                                               OVERALL CAMPUS

                                                                              •	Improved pedestrian/bicycle

                                                                              connectivity to neighboring

                                                                                                                                                                         community