Page 11 - Consequences of an Incorrect Seismic Survey
P. 11

When bedrock is as expected (a utopia!)















                1. Construction costs match cost plan provisions.



                2. Construction time on track with the planned schedule.



                3. Removes the stressful need to continually review and modify

                        engineering                       design                 and             construction                        to           accommodate


                        unanticipated issues.




















                                                                                                                                                                                11
   6   7   8   9   10   11   12   13   14   15   16