Page 6 - Consequences of an Incorrect Seismic Survey
P. 6

Accomplishing the Smooth and Satisfactory Construction of an Engineered Facility –


                           A Wharf for 40,000 DWT Deep Ocean Going Container Vessels











































   September 2007 – 3 nos. hydraulic piling hammer with 200 kN driving ram mass                                          April 2016 - During a 47 kPa Proof Load Test
                          on floating barges and heavy-lift cranes.



      With the very expensive construction plant and equipment deployed and manufacture of custom-designed piles

              required, the entire project process had to tick like clockwork from the start of the tendering  process.


                                                                                                                                                                                 6
   1   2   3   4   5   6   7   8   9   10   11