Page 37 - Performance / Statistics
P. 37
Infrastructure available:
1.Inspection Shed:- 03 pit lines and 04 catwalk arrangement with an overall length of
288.10mts/pitline, to undertake Trip/IA/IC schedules of EMU & MEMU Rakes of 12-
Car.
2.POH/ Heavy Repair Shed:- 03 repair bays (HL, ML & LL) with an overall size of 150
x 48
mts to undertake Heavy repair / POH schedule and other major unscheduled
attentions.
3. Washing Lines:-02 washing lines with catwalk arrangement for washing of EMU &
MEMU rakes of 9 car rake formation. Extension facility for 12- Car rake is under
process.
4. Stabling Lines:-03 stabling lines are available to stable EMU/MEMU rakes of 16
car length. These lines are used to stable any empty/spare rake .
5. Pit wheel lathe:- 01 No of conventional type Pit wheel lathe of M/s HYT make is
available. Any irregularity in wheel Dia or profile will be rectified in the pit wheel lathe
shed.
6. Oil filtration plant: 01 No oil filtration plant of M/s CEE DEE Make is available for
Filtration of transformer oil of EMU/MEMU coaches.
8. AMM Stores depot:-Stores depot available for procurement and storage of Stock
(Regular consumables) / Non-stock items.
Staff Position:
Actuals and Vacancy Position of EMU Car shed as on 28.02.2021
Sl. CATEGORY SCALE GRAD ECS/MLY
No E PAY S A V / E Remarks
I. SUPERVISORS
1. SSE 9300-34800 4600 16 13 3/0
2. JE 9300-34800 4200 09 07 2/0
25 20
II. ARTISANS
3. Sr. Tech 9300-34800 4200 31 30 1/0
4. Tech Gr.I 5200 – 2800 74 45 29/0
20200
5. Tech Gr.II 5200 – 2400 11 09 2/0
20200
135