Page 60 - GM Booklet 06.03.2021_Neat
P. 60
7. In view of COVID-19, Thermo graphic Temperature Screening System has been
installed at NZB station on 06.06.2020.
8. In view of COVID-19, Standby setup of Control Communication Setup of Board-I
(SC-DHNE) & Board-II (SC-MUE), FOIS, Railnet, Auto Phones & COA connectivity
provided at Gulistan / Hyderabad Bhavan.
9. Replaced 04 Nos. of Single Line Double Faced RDSO Train Indication Board (TIB)
(02 Nos. on each platform) at VAR station & 05 Nos. of Single Line Double Faced
RDSO TIBs (02 Nos. on each on PF-1 & PF-2 and 01 No. in Concourse) at FM
station by M/s Surya Electronics.
10. On 14.08.2020, M/s Surya Electronics make IPIS (Specn No.
RDSO/SPN/TC/61/2015 (Rev-4.0) Amdt.1) Integrated Passenger Information
System (IPIS) has been commissioned at JCL station with 24 Nos. of Coach
Indication Boards (CIB) on PF No.2, 01 No. of Single Line Double Faced Board
(SLDB) on PF No.1 & 2 each, 01 No. of Double Line Single Faced Board (DLSB)
at main entrance and 01 No. of At A Glance Board (AGDB) at PF No.2.
11. On 19.08.2020, M/s Surya Electronics make IPIS (Specn No.
RDSO/SPN/TC/61/2015 (Rev-4.0) Amdt.1) has been commissioned at SHNR station
with 25 Nos of Coach Indication Boards on PF No.1, 22 Nos of CIBs on PF No.2,
02 Nos. of SLDB -one each on PF No. 1 & 2, 01 No. of DLSB on concourse & 01
No. of AGDB.
.
51