7.  In view of COVID-19, Thermo graphic Temperature Screening System has been
                   installed at NZB station on 06.06.2020.


















               8.  In view of COVID-19, Standby setup of Control Communication Setup of Board-I
                   (SC-DHNE) & Board-II (SC-MUE), FOIS, Railnet, Auto Phones & COA connectivity
                   provided at Gulistan / Hyderabad Bhavan.

               9.  Replaced 04 Nos. of Single Line Double Faced RDSO Train Indication Board (TIB)
                   (02 Nos. on each platform) at VAR station & 05 Nos. of Single Line Double Faced
                   RDSO  TIBs  (02  Nos.  on  each  on  PF-1  &  PF-2    and  01  No.  in  Concourse)  at  FM
                   station by M/s Surya Electronics.

               10.  On     14.08.2020,     M/s     Surya     Electronics     make      IPIS    (Specn     No.
                   RDSO/SPN/TC/61/2015  (Rev-4.0)  Amdt.1)  Integrated  Passenger  Information
                   System  (IPIS)  has  been  commissioned  at  JCL  station  with  24  Nos.  of  Coach
                   Indication Boards (CIB) on PF No.2, 01 No. of Single Line Double Faced Board
                   (SLDB) on PF No.1 & 2 each, 01 No. of Double Line Single Faced Board (DLSB)
                   at main entrance and 01 No. of At A Glance Board (AGDB) at PF No.2.

               11.  On     19.08.2020,     M/s     Surya     Electronics     make      IPIS    (Specn     No.
                   RDSO/SPN/TC/61/2015 (Rev-4.0) Amdt.1) has been commissioned at SHNR station
                   with 25 Nos of Coach Indication Boards on PF No.1, 22 Nos of CIBs on PF No.2,
                   02 Nos. of SLDB -one each on PF No. 1 & 2, 01 No. of DLSB on concourse & 01
                   No. of AGDB.


















                      .