Page 65 - GM Booklet 06.03.2021_Neat
P. 65

II    BCNHL  wagons‟  door  opening  and
                    closing  gadgets  locally  prepared  at
                    Kacheguda  depot  and  handed  over  to
                    Commercial       department       of    the
                    loading/unloading  stations  for  proper
                    opening of wagon doors.





              III   In  view  of  COVID  19,  a  robot  called
                    “Hospital  Assistant”  for  Non  Contact
                    Temperature  measurement  in  Corona
                    ward     ensuring     minimum       human
                    interface has been developed at a cost
                    of  Rs.89,680  and  handed  over  to
                    central  railway  hospital  of  SCR.  It  has
                    provision of carrying medicine, food and
                    other  items  to  patients.  It  has  been
                    provided  with  emergency  light,  night
                    vision  camera  and  sound  systems
                    which enables doctors to communicate
                    with  the  patients  without  directly
                    approaching them.








              IV    In  all  the  coaches  fitted  with  Dellner
                    make  AAR  compatible  couplers,  Lock
                    Pin  was  provided  as  per  RDSO
                    guidelines.    Out  of  57  CBC  coach
                    holdings,  16  coaches  of  Dellner  make
                    coupler  coaches  were  provided  with
                    positive locking pin arrangement.



              V       KCG, NZB & BSX Railway Station has received TSPCB consent for Establishment
                      and consent for operation under Air and Water Pollution Act.
              VI      Freight Management Module (FMM) has been installed at NZB depot. BPCs were
                      issued for 5 trains after End to End examination using FMM.
              VII     Coaching depot, Kacheguda has taken initiative for replacing the defective thumb
                      springs of venation shutters of emergency windows. A total of 98 defective springs
                      were replaced.
             VIII     A full scale technical mock drill exercise on Train Accidents was conducted along
                      with NDRF staff at Bolarum on 13.02.2021. The entire relief and rescue operation
                      was completed in 45min.

              IX      Hyderabad division has achieved Environment shield for the year 2019.


                                                            56
   60   61   62   63   64   65   66   67   68   69   70