The following contracts have been considered as mentioned against each:


            Sl.              Contract                 Anticipated                    Remarks
            No                                      Savings 20-21
                                                                                                th
            1.    Shed      housekeeping        &        25,49,254  Contract  expired  by  30   Sep‟  2020.
                  Gardening                                           Carrying  out  by  shed  staff.  Toilets
                                                                                                       st
                                                                      cleaning  outsourced  w.e.f.  01   Oct‟
                                                                      2020
            2.    Loco interior and exterior and         24,69,489
                  components cleaning                                 Pre  closed  w.e.f.  01-08-20.  Carrying
            3.    DEMU  Interior  and  Exterior          21,36,576    out by shed staff.
                  cleaning of DPCs and TCs
            4.    Overhauling       of     bogie         47,65,619    Contract     lapsed     on    06-08-20.
                  assembly                                            Carrying out by shed staff.
            5.    AMC     for    Medha     make                       AMC  lapsed  on  04-08-20.  Carrying
                  Microprocessor based control           36,91,040    out by shed staff.
                  system
            6.                                                        AMC  lapsed  on  30-06-20.  Carrying
                  AMC for MCBG control unit               4,14,686
                                                                      out by shed staff.
            7.    AMC for CReDI locos                    26,49,432  Decided not to float the tender.
            8.    CAMC  for  IGBT  based  1600                        Tender  discharged.  Carrying  out  by
                  HP  3  phase  DEMU/DPC                 23,14,269    shed staff w.e.f 01  Sep‟ 2020.
                                                                                          st
                  control system
            9.    CAMC  for  IGBT  based  1600
                  HP  3  phase  DEMU/DPC                 38,58,837    Pre  closed  from  01-08-20.  Carrying
                                                                                                st
                  control   system      (Running                      out by shed staff w.e.f 01  Sep‟ 2020.
                  Contract)
            10.   Disinfection      of      Work          6,55,996    Decided  not  to  float  the  tender.
                  premises, Locos & DEMUs                             Carrying out by shed staff
            11.   Annual maintenance Contract                         Pre  closed  from  01-08-20.  Carrying
                                                                                                      st
                  for Auxiliary power Unit fitted        31,67,725  out  by  shed  staff  w.e.f.  01   Sep‟
                  on ALCO Locomotives                                 2020.
            12.   AMC  for  REMMLOT  system                           Pre closed for 4 months from 01-08-
                  of M/s Medha make fitted on             4,17,539  20  up  to  Nov‟20.  AMC  Restored  as
                  32 Alco Locos                                       per instructions of HQ
                          Total savings                2,90,90,462

            NOTE:  All  the  Outsourcing  Contracts  and  all  the  Loco/DEMU  AMCs  have  been
            terminated and shed staff are carrying out these activities.

                  AAC revision and critical review of NS indents:
                                     d.
                   Keeping  in  view  of  No  services/partial  services  due  to  prolonged  lockdown  and
                   considering shop floor inventory, critical review of stocked items was conducted that
                   resulted in reduction in procurement expenditure of about INR 5.78 Cr and advised
                   for  postponement  of  procurement  of  NS  items  worth  INR  14.87  Lakhs.  Total
                   anticipated reduction in expenditure during 2020-21 is INR 5.92 Cr