Page 11 - Vessel Sanitation Program 2018 Construction Guidelines
P. 11
VSP 2018 Construction Guidelines
22.1.4 Intervals ................................................................................................................. 67
22.1.5 Downstream of an RP Assembly ........................................................................... 67
22.1.6 Refrigerant Brine Lines and Chilled Water Lines ................................................. 67
22.2 Bunker Stations ......................................................................................................... 67
22.2.1 Position Connections ............................................................................................. 67
22.2.2 Connection Caps .................................................................................................... 67
22.2.3 Unique Connections .............................................................................................. 67
22.2.4 Labeling ................................................................................................................. 67
22.2.5 Filter Location ....................................................................................................... 67
22.3 Filling Hoses ............................................................................................................. 67
22.3.1 Approved ............................................................................................................... 67
22.3.2 At Least Two Hoses .............................................................................................. 68
22.3.3 Label Hoses ........................................................................................................... 68
22.4 Potable Water Hose Storage ..................................................................................... 68
22.4.1 Construction .......................................................................................................... 68
22.4.2 Mounting ............................................................................................................... 68
22.4.3 Self-Draining ......................................................................................................... 68
22.4.4 Label Lockers ........................................................................................................ 68
22.4.5 Size ........................................................................................................................ 68
22.5 International Fire Shore Connections and Fire Sprinkler Shore Connections ......... 68
22.5.1 RP Assembly ......................................................................................................... 68
22.6 Storage and Production Capacity for Potable Water ................................................ 68
22.6.1 Minimum Storage Capacity................................................................................... 68
22.6.2 Production Capacity .............................................................................................. 69
22.7 Potable Water Storage Tanks .................................................................................... 69
22.7.1 General Requirements ........................................................................................... 69
22.7.2 Storage Tank Access Hatch ................................................................................... 71
22.7.3 Storage Tank Water Level ..................................................................................... 71
22.7.4 Storage Tank Vents ............................................................................................... 71
22.7.5 Storage Tank Drains .............................................................................................. 71
22.8 Suction Lines ............................................................................................................ 72
22.9 Potable Water Distribution System .......................................................................... 72
22.9.1 Location ................................................................................................................. 72
22.9.2 Pipe Materials ........................................................................................................ 73
22.9.3 Fixtures That Require Potable Water .................................................................... 73
22.9.4 Paint or Stripe ........................................................................................................ 73
22.9.5 Steam Generation for Food Areas ......................................................................... 73
22.10 Disinfection of the Potable Water System ................................................................ 73
22.10.1 Before Placed in Service ....................................................................................... 73
22.10.2 Free Chlorine Solution .......................................................................................... 74
22.10.3 Documentation ...................................................................................................... 74
22.11 Potable Water Pressure Tanks .................................................................................. 74
22.11.1 No Connection to Nonpotable Water Tanks .......................................................... 74
22.11.2 Filtered Air Supply ................................................................................................ 74
22.12 Potable Water Pumps ................................................................................................ 74
22.12.1 Sizing ..................................................................................................................... 74
xi