Ground Improvement Method   Ground Improvement Method



 Stone Column / Vibro Replacement                 Vibro Compaction


 Stone Column / Vibro Replacement
                       (i) Densifies non cohesive soil by aid of vibration and improves the ground.
 Usually   Two methods    (ii) Improves non compactible cohesive soil by installation of load bearing column of well
 Diameter: 0.8 – 1m    compacted, coarse grained backfill material.
 Depth: 6 - 20m
 Spacing: 1.5-2.5m c/c


 Material : rock / stone size up to 12’
 Design: stability, settlement, gain strength
 Parameters : loading, column radius & spacing, replacement
                       area, C , C , T , e C , , , P , C , M
 v
 c
 c
 u
 v
 r
 v
 o ,
 Require :  90% settement on completion of construction
                      Total residual settlement < 250mm  for 5 years
                      post construction







  water is used to flush    mandrel is jacked into
 out soils and stones   the ground and stones
 fed into the hole   fed through mandrel   Penetration           Compaction               Backfilling
 Completed Column