Page 144 - Handbook GEOTEKNIK_Final_Neat
P. 144

Instrumentation                                                                                                                   Instrumentation



                             Objectives of                                       Description
                            Instrumentation


                       Verification of Design      Data obtained from instrumentation can be used to verify that the
                       Parameters                  constructed embankment, slope, wall, etc. behaves as predicted during
                                                   and after construction. Initial data can be used to modify the design if
                                                   necessary

                       Evaluate Performance        Instrumentation can be used to monitor construction performance of the
                       During Construction         embankment, slope, wall, etc. that may affect or be affected by
                                                   construction activities that may affect the construction schedule


                        Evaluate Performance of    Existing embankments, slopes, walls, etc. can be instrumented to assess
                       Existing Structures         the existing conditions and to guide remediation measures, if necessary



                       Detect short and long-term   Before potential problems are visible to observers, instrumentation can
                       trends                      provide the first indication of how a structure is going to perform over short-
                                                   term and long-term periods
                       Safety                      Instrumentation can serve as the first warning sign of a potentially unsafe
                                                   situation. An instrumentation and monitoring program can also play a role
                                                   in easing public concerns over safety of areas surrounding the construction
                                                   site

                                                   Instrumentation can provide documentation as to the relationship between
                        Legal Protection           construction and surrounding structures. In the event of litigation, data from
                                                   these instruments can be used to prove/disprove connection of damage in
                                                   surrounding areas to construction activity





      128  PUBLIC WORKS DEPARTMENT MALAYSIA                                                                                                                                                                                      GEOTECHNICAL ENGINEERING HANDBOOK 129
   139   140   141   142   143   144   145   146   147   148   149