Page 141 - Handbook GEOTEKNIK_Final_Neat
P. 141

Ground Improvement Method   References


 Compaction Grouting


 Technique of injecting very low, slump grout under high pressure to densify mostly granular soils.
                      •   JKR Standard Specifications For Building Works, 2014
 Solution for the sinkhole movement, loose soil strata
                      •   JKR Standard Specification For Road Works, 2013


                      •   JKR Guidelines For Slope Design, 2010
 Drill   Compaction   Casing   Casing   JKR Guidelines On Slope Maintenance In Malaysia, 2006
 Rod   Grout Casing   •

                      •   JKR Standard Specifications For Building Works, 2014

                      •   JKR Standard Specification For Road Works, 2013

                      •   JKR Nota Teknik (Jalan) 24/05 – Guidelines for Hard Material/Rock Excavation









 Step 3:   Step 4: Withdraw
 Step 1 :   Step 2:   Begin Pumping   casing as stages
 Predrilled   Insert   low slump   are complete until
 compaction   compaction   compaction   the hole is
 grouting hole to   grout casing in   grout mix in   complete
 desired depth   predrilled hole   stages &
 withdraw

 124  PUBLIC WORKS DEPARTMENT MALAYSIA                                                         GEOTECHNICAL ENGINEERING HANDBOOK 125
   136   137   138   139   140   141   142   143   144   145   146