Ground Improvement Method References
Compaction Grouting
Technique of injecting very low, slump grout under high pressure to densify mostly granular soils.
• JKR Standard Specifications For Building Works, 2014
Solution for the sinkhole movement, loose soil strata
• JKR Standard Specification For Road Works, 2013
• JKR Guidelines For Slope Design, 2010
Drill Compaction Casing Casing JKR Guidelines On Slope Maintenance In Malaysia, 2006
Rod Grout Casing •
• JKR Standard Specifications For Building Works, 2014
• JKR Standard Specification For Road Works, 2013
• JKR Nota Teknik (Jalan) 24/05 – Guidelines for Hard Material/Rock Excavation
Step 3: Step 4: Withdraw
Step 1 : Step 2: Begin Pumping casing as stages
Predrilled Insert low slump are complete until
compaction compaction compaction the hole is
grouting hole to grout casing in grout mix in complete
desired depth predrilled hole stages &
withdraw
124 PUBLIC WORKS DEPARTMENT MALAYSIA GEOTECHNICAL ENGINEERING HANDBOOK 125