Typical JKR’s Termination Criteria for Borehole & Rock   Field Testing


 Termination   Building   Embankment   Cut Area   River   Bridge   Field Works   Description/   Limitation   Photos
 Criteria                          Purpose
 SPT N-value    Five (5) times   Three (3) times   Three (3) times   Three (3) times   Seven (7)
 SPT N-value = 50   SPT N-value = 30   SPT N-value =   SPT N-value =   times SPT N-
       50    30    value = 50
                 4. Trial Pits     to obtain      for shallow
                                  bulk sample      depth up to
                                  for soil         approximately
 Or*   Or*   Or*   and   Or*   Or*   classification   3.0m


 Termination   45.0   30.0   At least 5m   30.0   50.0
 Depth (m)   from Formation
 Level

 Table 5: Typical JKR’s Termination Criteria for Borehole & Rock   Notes:* Whichever comes first


 Rock Type   Min. Core Length
 Igneous rocks (granite) & bore depth < 24m or Recovery ratio R/  4.5m   Figure 8: Bulk Sample for Trial Pit
 r < 50%
 Igneous rocks, bore depth > 24m   3.0m
 Shale/schist/slate/sandstone   6.0m
 Recovery ratio R/r < 50%
 Shale/schist/slate/sandstone   3.0m
 Recovery ratio R/r > 50%
 Limestone R/r > 50% and no cavity   6.0m
 Limestone R/r < 50% or with cavity   9m – 21m
 Other rocks R/r > 50%   4.5m
 Other rocks R/r < 50%   6.0m
 Min. core size should be 52mm diameter (NMLC or HMLC or equivalent)