Page 127 - BASIC GUIDELINE FOR QS
P. 127

Professional Practice: Guideline for Quantity Surveyor                                                     Chapter 4



                          The  minimum  validity  period  of  a  tender  is  90  days  from  the  date  the  offer  is

                   closed. Agencies must plan so that the decision and the offer can be made in the tender
                   validity period. A long validity period of time may result in a higher price offered.


                   4.5.4  Tender Box
                   Preparations to accept the tender offers are:

                            Prepare the tender box;
                            Place the tender box in a suitable place making it easy to put the offer

                            Ensure the tender box safety
                            Label the tender box with the tender number, tender description closing date

                              and time;
                            The tender box shall have two keys held by two (2) separate officers; and
                            Place all bids received in the tender box.























                                                   Figure 4.7: Tender Box















                                                             116
   122   123   124   125   126   127   128   129   130   131   132