Page 127 - BASIC GUIDELINE FOR QS
P. 127
Professional Practice: Guideline for Quantity Surveyor Chapter 4
The minimum validity period of a tender is 90 days from the date the offer is
closed. Agencies must plan so that the decision and the offer can be made in the tender
validity period. A long validity period of time may result in a higher price offered.
4.5.4 Tender Box
Preparations to accept the tender offers are:
Prepare the tender box;
Place the tender box in a suitable place making it easy to put the offer
Ensure the tender box safety
Label the tender box with the tender number, tender description closing date
and time;
The tender box shall have two keys held by two (2) separate officers; and
Place all bids received in the tender box.
Figure 4.7: Tender Box
116