STEPS TOWARDS AN AGREED STATEMENT OF FACTS
                                                      And stipulations

               7.5 Comments on Key Elements (Continued)

                       The EDF building is no longer operational thus any flow from the development site is
                       incremental.

                       The figures produced in the transport statement are highly misleading.  They
                       exaggerate what had been the flow of traffic from the EDF site and grossly          Page | 25
                       underestimate flows from a development site.

               A case was constructed around data produced by the TRICS database. TRICS is sponsored by
               six UK counties and purports to calculate traffic flows based on variables, including the
               number of households contributing to a flow or the square footage of office blocks. It is
               widely used by developers and planners; incredibly presenting data to 3 or 4 decimal places
               of accuracy.

                       In fact, TRICS is a crude and unreliable tool especially when it is finessed to produce a
                       desired result.
               Motion Consultants selected two TRICS data base categories for its analysis:

                   a)  Offices with a floor space of between 186 sqm and 5,000 sqm to calculate the flow
                       from the EDF building; with data collected from 11 survey sites of which 7 were in the
                       north of England and based on only 11 days of data between 2009 and 2017;

                   b)  Residential flats in the range of 8 to 135 units to estimate the flow from the proposed
                       development, based data for only 11 days between 1  January 2009 and 9
                                                                         st
                                                                                              th
                       November 2016.
               Appendices C and D show the data sets used, as follows:



























               Table 7: Data sets used by Motion Consultants Ltd

               The areas selected for a) were totally different from b) and neither represented the
               demographics and commuter travel times and patterns of WH, or the percentage of car
               ownership per dwelling.  Sixteen of the twenty-two datasets were from the north of England.
               Also, the peak hour flows were arrivals at the EDF building and departures from the proposed
               development.