Page 7 - Ashbourne Park
P. 7
STEPS TOWARDS AN AGREED STATEMENT OF FACTS
And stipulations
List of Appendices (Continued)
Ref Content Significance Para
E1 WH sites
Estimated internal At 5 internal junctions
traffic movements Main entrance from the A22
F1 AWNP Available land FROM SUSTAINABILITY REPORTS
Land for 356 dwellings identified in AW
Ashurst Wood OAN requirement
60 dwellings to 2024 plus
42 dwellings to 2031
Total OAN to 2031=102 dwellings
Dwellings per hectare = 3.2
Population per hectare = 7.05
Results of village referendum by site
SITES IDENTIFIED BY MSDC- SHELAA
F2 Wealden House sites ANALYSIS OF THE PROPOSED DEVELOPMENTS
Detail
EDF BUILDING
Total area of site = 1.437 hectares
Woodland = 0.597 hectares
Available=0.84 hectares
Available =90,384 sq.ft
Footprint =3,057 sq.m
Footprint = 32,893 sq.ft
Existing traffic flow=0
CURRENT APPLICATION
Total footprint = 0.461 hectares
Total footprint = 4,611 sq.m
Total footprint =49,635 sq. ft (From Att E1)
Modules = 7
1 bed room flats = 18
2 bed room flats = 53
Total flats = 71
Market flats = 50
Affordable flats = 21
Ratio of affordable to total=30%
Ratio of affordable to market =42%
Parking spaces =50
Parking spaces undercover = 15
Ratio of undercover to open = 30%
Ratio of undercover to total = 16%
Visitors’ parking spaces= 18
Total parking spaces = 93
Ratio of parking spaces to flats= 1.30
Ratio of flats to parking spaces = 0.76
Cycle racks = 48*
Population = 142
Population density =308 hectare
Density of dwellings=201 hectare