• Khorfakan Club for the Disabled
• Cancer Awareness campaign
• Over the past years the Company has concentrated towards internal employees for donations
needed for specialized schools and/or hospitals, to help the families of children with disability.
• Assigned 20 fresh graduate engineers from various disciplines in Hail and Ghasha project to develop
their technical skills and knowledge and prepare them for future challenges.
7.3. Contribution to Environment Protection
Environmental Management
Supervision and monitoring of environmental aspects at all NMDC projects and activities in Abu Dhabi,
mainly at Musaffah Base, Jubail, Khalifa Port, Hudariyat, Mugharraq, Sila, Hail & Ghasha fields and
Emarat Europe; in addition to across boarders for projects in Egypt.
Leading a challenging interaction within critical environmental area by continuing to execute Hail and
Ghasha project inside MMPA (Murawah Marine Protected Area) as well as construction activities on
Butinah Island. The project is being closely monitored by EAD and other international environmental
agencies due to the global importance of the area.
Compliance to Environmental Legal requirements
Ensured compliance with applicable local and federal legal requirements, which led to successfully
obtaining the necessary Environmental Permits (NOC’s) for NMDC projects, such as Khalifa Port Project,
Mugharraq, Sila, Jubail, Hail and Ghasha projects.
Updated NMDC’s Environmental Management System to satisfy the requirements of ISO 14001:2015,
resulting in successfully obtaining the certification.
Environmental Studies
Assignment of EAD approved third party consultants for execution of environmental studies for several
projects, whenever required, which have been later reviewed, assessed, and approved by relevant
authorities (EAD and/or Client).
Control Plans
Preparation and implementation of Construction Environmental Management Plan (CEMP) in line with
third party environmental studies and / or applicable legal requirements for all NMDC projects. Company
also prepared and implemented Mangrove Planting Management Plan (MPMP) for Jubail project, and
waste reduction plan for Mussafah base and Emarat Europe factory.
Inspections and Audits
With total number of environmental inspections approaching 950 inspections during 2020, we were
able to cover all ongoing NMDC Projects.
Monitoring of Performance
Implementation of monitoring programs for specific environmental indicators such as water, air, noise,
waste, effluents, soil, etc. in line with project’s environmental requirements and NMDC Environmental
Management System requirements (applicable on projects, offices and vessels).