Page 224 - ENGLISH PR REPORT FEBRUARY 2024
P. 224

2/26/24, 11:09 AM                  Dubai Municipality initiates project to develop Dubai Creek pier, upgrade support walls
         segment will be sequentially patterned to ensure uninterrupted docking traffic. The second phase will cover
         a 2.3 km length on the Bur Dubai side.


         Global  Reputation  Dawoud  Al  Hajri,  Director-General  of  Dubai  Municipality,  stated  that  the  project

         highlights  Dubai  Municipality’s  commitment  to  transforming  Dubai  into  a  more  attractive  and  innovative
         city  by  enhancing  various  elements  and  services  it  offers  through  the  strategic  and  sustainable

         development  of  all  coastal  facilities  and  infrastructure  in  the  Emirate.  The  goal  is  to  solidify  Dubai’s
         position as a global tourism hub and augment its economic and commercial prosperity.


         Al  Hajri  said,  “The  project  is  set  to  improve  security  and  safety  measures  for  maritime  traffic  and

         commercial operations within Dubai Creek. As a significant symbol of the city’s growth, Dubai Creek serves
         as a vibrant artery at the heart of Dubai.


         Facilitating the passage of over 13,000 ships annually, it plays a key role in fostering the economic and
         social  prosperity  of  the  emirate.  Additionally,  the  creek  further  supports  commercial  dealings  with

         neighbouring markets in the region.”


         “We  have  implemented  several  measures  to  mitigate  the  risks  posed  by  climate  change  and  rising  sea
         levels, closely monitoring changes on both sides of the creek. Furthermore, we have conducted technical

         studies to devise construction designs that can enhance the efficiency of the marine docks on both banks.


         These designs adhere to the highest global standards, ensuring the preservation of the supporting walls’
         stability and safeguarding against increased flooding during seasonal weather conditions.” Al Hajri added.


         Comprehensive  work  The  project's  14-month  timeline  includes  the  restoration  of  the  2.1  km  Deira  pier,

         which  involves  replacement  and  the  rehabilitation  of  damaged  sections  of  the  concrete  wall,  reaching  a
         depth  of  8  meters  and  increasing  its  height  to  3  meters.  These  improvements  aim  to  ensure  the  safe
         docking of ships in the area.


         By  initiating  this  project,  the  Municipality  aims  to  enhance  services  and  facilities  for  safe  docking  and

         navigation, which will be ensured through the provision of 200 anchors across the dock.


         Dubai Creek  is one of the most vital historic maritime  channels in the Emirate, marking the initiation of
         Dubai’s trade interactions with the world over a century ago.


         Despite the extensive development in the Emirate of Dubai, the Creek continues to maintain its historical,

         commercial, and economic importance, along with modern projects prevalent in the emirate, in addition to
         serving as a significant tourist hub for residents, visitors, and tourists.








      https://mebusiness.ae/ar/news/show/88872                                                                      2/2
   219   220   221   222   223   224   225   226   227   228   229