Analisis Finansial
A. Investasi
RINCIAN SPESIFIKASI INSTALASI PADI HIDROGANIK
No Alat dan Bahan Jumlah Satuan Harga Total
1 Kanal C 6 Lonjor 75,000 450,000
2 Reng 15 Lonjor 45,000 675,000
3 Paralon 4" Type D 25 Lonjor 180,000 4,500,000
4 Tutup 4" 10 Biji 10,000 100,000
5 Paralon 3/4" 1 Lonjor 35,000 35,000
6 Tutup 3/4" 2 Biji 5,000 10,000
7 T 3/4" 1 Biji 5,000 5,000
8 Knee 3/4" 1 Biji 3,000 3,000
9 Overlupe 3/4" - 1 Biji 5,000 5,000
1/2"
10 Paralon 1" 1 Lonjor 24,000 24,000
11 Sdl 1" 1 Biji 5,000 5,000
12 Sdd 1" 1 Biji 5,000 5,000
13 Paralon 3" 1 Lonjor 20,000 20,000
14 Knee 3" 1 Biji 7,000 7,000
15 Pompa 1 Buah 250,000 250,000
16 Asbes 41 Lembar 10,000 410,000
17 Baut Dreling 1000 Biji 300 300,000
18 Wd Cutting 1 Pack 85,000 85,000
19 Selang Karet 1 Meter 20,000 20,000
20 Terpal 4x14 1 Buah 1,008,000 1,008,000
21 Gelas Netpot 360 Biji 300 108,000
22 Kain Flanel 360 Biji 300 108,000
23 Nampan 30 Biji 12,000 360,000
24 Biaya pekerja 2 orang 900,000 1,800,000
Total keseluruhan 10, 293,000