Page 303 - ScopeCompendiumBook
P. 303

Fighting the                                         and visitor became a practice at RailTel offices. RailTel

                                                                 had  already  adapted  NIC  e-office  and  majority  of
            Pandemic                                             it’s  file  work  were  being  done  in  digital  platform,

                                                                 so when Work from Home became the need of the
                                                                 hour,  RailTel  was  ready  for  it  and  the  transition
            Monetary Contribution to PM CARES Fund
                                                                 was swift and smooth. All employees were given
            RailTel  has  contributed  Rs  12  Crores  to  the  Prime   access to RailTel’s Virtual Private Network through
            Minister’s Citizen Assistance and Relief in Emergency   which they can use E-office, ERP, Intranet platforms
            Situation fund (PM- CARES fund) from the CSR fund    remotely so that regular work is not hampered.
            and  company  contribution  of  RailTel.  In  addition,
            contribution of Rs 15.5 lakh which is the voluntary   Any Other Significant Measures taken by the
                                                                 Company
            contribution of one day’s salary of RailTel employees
            to fight this deadly disease has also been made.     RailTel  handles  crucial  communication,  video
                                                                 conferencing  and  implementation  of  e-office
            Payment to Contractual Workers during                platform as well storing important data for Indian
            Lockdown Period
                                                                 Railways  in  its  two-Tier  III  data  centres  (Gurgaon
            All payments to contractual workers were made        and  Secunderabad). In the current crisis  situation,
            at regular  time.  The  payment schedules  were  not   ensuring the availability of essential commodities
            affected by COVID-19.                                and associated supply chain was of paramount
                                                                 importance  for  which  Railway  freight  operations
            Innovation, R&D and Technological                    needed to be unhindered. The need of the hour was
            breakthrough
                                                                 keeping  the  network  and data centre operations
            An android app to enable  tele-consultation for      stable so that it doesn’t hamper the Railway freight
            Railway employees  to fix appointment and remotely   movement  and communication between all the
            consult a Railway Doctor over video call  has been   offices of Indian Railways across the country.
            developed and soft launched  and consultations
            have started for 6 dispensaries of Northern Railway    To run the two data centres and 4 Regional Network
            and Northern Railway  Central Hospital, for General   Operation  Centres  and  One  Central  Network
            physician, Out Patient rooms  for Medicine, Surgery,   Operation  Centre,  RailTel  management  deployed
            Orthopedic,  Gynecology,  ENT,  Pediatrician,  Eye,   minimal physical workforce of 2-3 employees for
            Emergency, Retired Patient OPD, Medical Director     whom rosters was prepared and duties were set on
            Room, Skin, Psychiatry, Oncology and Nephrology.     rotation basis. Special arrangements for Boarding
                                                                 and Lodging were made either at RailTel premises
            Preventive Measures (for the Organisation            or  at  a  nearby  residential  areas  close  to  RailTel
            and Employees)
                                                                 offices so that the employees do not need to travel
            Even before the country went under lockdown,         over long distances or use mass transport. Majority
            RailTel, following Govt. advisory, prepared roster of   of  the  Network  Management  work  was  being
            employees to start working with skeletal workforce   handled  through  internal  Network  monitoring
            on  ground  and  rest  from  home.  Cleanliness  and   platforms and tools of RailTel remotely. RailTel has
            hygiene  were  always  a  mandate  at  RailTel  offices   been  implementing  e-office  for  Indian  Railways
            but with spread of COVID-19, extra measures like     for  enabling  paperless  office  system  and  despite
            cleaning and disinfecting surfaces  a number of      nationwide  lockdown,  RailTel  has  successfully
            times during the day, sanitizers at office premises,   completed the phase 2 of implementing NIC e-office.
            temperature check at the entrance for all employees   RailTel started work of Phase 2 (46 Divisions with


            276   Building Self Reliant, Resurgent, Resilient India - PSEs Contribution Amidst COVID-19
   298   299   300   301   302   303   304   305   306   307   308