ARB Process for Approval


         Applications for review should be submitted through the owners
         portal. They will be reviewed for completeness and compliance
         with the community’s guidelines by the management company.
         Once complete, the application is submitted to the Architectural
         Review Board for consideration.
         Applications will be “Approved as submitted”, “Approved with
         Conditions” or “Denied,” based on the determination of the ARB.

         Typically, reviews can take up to 30 days for processing, so
         please plan accordingly with your planned improvement project.



                            ARB Guidelines


           Hedges are encouraged between lots as an alternative to
            fencing; rear and side yard property line fencing may be
            permitted with a 7’ max height. Fences along the front setback
            are limited to 3’ max height. The unfinished side of fencing will
            face the interior of the lot. Any mesh fencing (chain, plastic, vinyl
            coated) is not permitted. No plastic or vinyl fences are permitted.
            Stockade fences are not permitted.

           All ancillary structures must be designed consistent with the main
            home.

           Storage tanks must be buried

           Play equipment is permitted in the back or side yard only.
           Awnings are discouraged.

           Satellite dishes should be placed on the roof on the back of the
            home where possible. Additional landscaping may be requested
            to hide satellite dishes.

           Additional landscape guidelines are available in the ARB
            Guidelines.