Large 900 50 900 2 1,800 7.10
Nuclear 1200 20 6,000 2 12,000 0.50
Total 32,040 26,51
Notes:
1. Maximum generating power is the output of the station measured in megawatts (MW) at 100%
operating capacity. The electricity produced by a station is measured in megawatt hours (MWh).
2. It is assumed that the same load factor applies across all the different types of stations, i.e. they
are working at the same percentage of capacity throughout the year.
3. Operating cost of electricity is the cost before the cost of financing the capital invested in a
station.
4. The CO2 emissions are estimated based on industry standard figures for similar stations.
5. Capital costs and CO2 emissions figures are current best estimates.
2017 AUDITED FINANCIAL STATEMENTS –APPENDIX 2
2.1 CONSOLIDATED INCOME STATEMENT
for the year ended 31 December 2017
Notes:
1. Over 50% of operating costs is remains salaries, wages and other employee benefits.
2. It is estimated that 10% of the operating costs is depreciation.
The CFO Case Study Competition Pack (Extended scenario)