                           Large              900         50         900          2        1,800        7.10
               Nuclear                       1200         20        6,000         2       12,000        0.50
               Total                                                                      32,040       26,51

               Notes:
                   1.  Maximum generating power is the output of the station measured in megawatts (MW) at 100%
                       operating capacity. The electricity produced by a station is measured in megawatt hours (MWh).
                   2.  It is assumed that the same load factor applies across all the different types of stations, i.e. they
                       are working at the same percentage of capacity throughout the year.

                   3.  Operating cost of electricity  is the cost before the cost of financing the capital  invested  in a
                       station.
                   4.  The CO2 emissions are estimated based on industry standard figures for similar stations.
                   5.  Capital costs and CO2 emissions figures are current best estimates.

                        2017 AUDITED FINANCIAL STATEMENTS –APPENDIX 2



               2.1     CONSOLIDATED INCOME STATEMENT
                       for the year ended 31 December 2017






























               Notes:


                   1.  Over 50% of operating costs is remains salaries, wages and other employee benefits.
                   2.  It is estimated that 10% of the operating costs is depreciation.