Analysing and predicting costs
n∑xy – (∑x)(∑y) (4 × 1,877.5) – (45 × 163.9) 134.5
b = ——————— = ———————————— = ——— = 2.27
2
2
2
n∑x – (∑x) (4 × 521) − 45 59
So our variable cost per unit is $2.27. Using the high-low method, our answer was
$2.30.
a = y − ̅ b x ̅ = (163.9 ÷ 4) − 2.27 × (45 ÷ 4) = 15.438
So our fixed cost is $15,438. Using the high-low method, our answer was $15,000.
Regression uses all of the observations rather than just the highest and lowest so
gives a better estimation of a and b.