From: Chris Kim
Sent: Thursday, April 4, 2019 1:50 PM
To: ACI.ALL <aci.all@angelescontractor.com>
Subject: SAFETY MEMO # 014 <<MANDATORY>> Procurement of Protective Covers to be readily available ALWAYS !!
To: ACI PROJECT DIVISION
<<MANDATORY>>
Procurement of Protective Covers to be readily available ALWAYS
Per Safety Memo #002 as noted below, Protective Covers are mandated as required on the SAME DAY of
rebar(straight/bent) and all metal or wood stakes installation.
As a pro-active measure, each jobsite MUST procure at least 100 protective covers to ALWAYS be readily available,
especially if any impalement hazard exists.
If you have any questions on purchasing the protective covers, please contact Brian Shin for assistance.
Thank you,
Safety is ACI’s number one priority.
Chris Kim | Senior Vice President
ANGELES CONTRACTOR, INC.
783 Phillips Drive, City of Industry, CA 91748
T 626.923.3800 | F 626.923.3801 |C 714.709.3337
From: Chris Kim
Sent: Monday, September 17, 2018 4:15 PM
To: ACI.ALL
Subject: SAFETY MEMO # 002 <<MANDATORY>> [1] Impalement Protection and Protective covers for rebar and form
stakes, [2] Fall Protection
To: ACI PROJECT DIVISION
<<MANDATORY>>
[1] Impalement Protection and Protective covers for rebar and form stakes
[2] Fall Protection
< 1 >
As of today, all ACI jobsites MUST have the Protective Covers on the SAME DAY of rebar(straight/bent) and all metal or
wood stakes installation.
This falls under the category of Impalement Hazards In Title 8, §1712. Requirements for Impalement Protection, OSHA covers
the topic of Protection from Reinforcing Steel and Other Similar Projections to all work sites and locations where employees
work around or over expose projections. Projections are defined as a thing that extends outward from something else. Rebar,
straight or bent; vertical or horizontal, along with metal and wood stakes, are under this category.
If your subcontractor does not comply with this safety requirement, then the installation must be put on HOLD until the
subcontractor procures the Protective Covers.
Please refer to the link below for further detail:
Additional Impalement Hazard Above Grade