Page 37 - BER Company Brochure
P. 37
Labs
BAE
Lexington, Massachusetts
Renovation for the relocation of Lab equipment.
SAINT GOBAIN
Worcester, Massachusetts
Renovation of existing shell space on level 3 for
new Process Lab.
CALIPER (PERKIN ELMER)
Hopkinton, Massachusetts
Relocation of the Analytical Labs and Vivarium to their
Hopkinton campus. Project included a Class 1,000 Clean
COMTECH – STOUGHTON, MA Room, Chemistry Labs, Vivarium, Tissue Culture Labs
and Support space. The space included a new DDC
COMTECH Control System and Pressurization Control. This project
Stoughton, Massachusetts was approximately 15,000sf and was brought on line in
Evaluation of HVAC systems for a Computer Room high density December 2013.
cooling system for Lab spaces.
GOOD START GENETICS
COLLEGIUM PHARMACEUTICAL Cambridge, Massachusetts
Stoughton, Massachusetts Laboratory space in an old mill building for Chemical and
HVAC design for a pharmaceutical lab, with leased space total of Analytical Labs. The project included ground floor Labs,
3,200sf on the 2 floor of an existing Stoughton office building. a Class 100,000 Clean Room, fume hood exhaust and
nd
The challenges included routing new ductwork from the Lab area new make-up air system for pressurization control. The
up through the other four levels to the roof. The exhaust system
served multiple rooms with fume hoods connected to a fume hood Lab space was approximately 5,000sf and was completed
exhaust fan systems, high plume exhaust fans, controls and in 2012.
provision of makeup air and space temperature control.
MAGELLAN AEROSPACE
(PRIVATE CLIENT) - INDUSTRIAL HYGIENE LABORATORY Haverhill, Massachusetts
Hopkinton, Massachusetts
Renovation to an existing 5,900sf building to house Industrial 60,000sf industrial process building for Aerospace
Laboratory. Addition of a new 60,000sf building to house Claims components. Project included Clean Room, Paint Booths,
Training, Personal Markets Unit, Loss Prevention Unit and Ovens, Plasma Nitrate and Process Manufacturing
common space. machinery.
MEDTRONIC VASCULAR ANTIGENICS
Danvers, Massachusetts
Renovation of 80,000sf for offices and conference rooms. Lexington, Massachusetts
30,000sf Class 100,000 Clean Room. 8,000sf Class 10,000 Renovation of existing GMP facility of approximately
Clean Room and Warehouse. 80,000sf interior fit-up for Labs, Offices, Animal Facility,
Clean Room and Manufacturing.
ALTUS PHARMACEUTICAL
Lexington, Massachusetts RAPID MICRO BIOSYSTEMS
A 100,000sf Research Facility with 60,000sf Office space; 40,000sf Lowell, Massachusetts
Lab and Support space. Project included Research Production and Clean Room renovations.
Quality Control Labs.
ARGOS CORPORATION
Taunton, Massachusetts
Electrical engineering for power to the new White Room.
66 Main Street North Easton, MA 02356 T 508.230.0260 F 508.230.0265 www.ber-engineering.com
351 Centerville Road Warwick, RI 02886 T 401.384.7682
D E S I G N | K N O W L E D G E | S O L U T I O N S