Page 22 - 86064_NSAA_W19_web
P. 22
Courtesy of Meterlogic Safety These two areas monitor And, at the risk of stating the obvious, the analysis should
be followed by thorough training of employees in the
their system using a
Schneider Electric power
importance and use of PPE and the policies and procedures
management solution called
to support the safety programs. This training is critical, as
Power Monitoring Expert
(PME), said Jeff Keener, is adherence to all federal, state, manufacturer, and ski area
rules pertaining to the handling of high-voltage panels.
business development A thorough, exacting approach to electrical safety—
specialist for Meterlogic. combined with emerging technology designed to prevent
“PME can utilize meter hazards—is critical when it comes to keeping our employ- D-Line:
information to provide ees as safe as possible in their role of helping us run
alarms and notifications, the mountain. Welcome to first class
and it can also be linked to
A Meterlogic electrical measurement the Meterlogic secure cloud Further Resources
safety tool installed on a power panel.
hosting system, which Personal Protective Equipment Doppelmayr defines the ropeway future: 205 new developments,
allows for remote access from any computer screen for https://ohsonline.com/Articles/2014/03/01/PPE-What-You-Need.aspx including 31 innovations and 14 patent applications. The D-Line impresses
complete viewing of your PME system,” Keener said. “PME NFPA 70E Standard for Electrical Safety in the Workplace® with top ride comfort, ultramodern design and unsurpassed functionality.
also provides easy-to-read and easy-to-use power manage- https://www.nfpa.org/70E
ment and power quality reports based on your needs OSHA 1910.335 – Safeguards for Personnel Protection
and timeframe.” https://www.osha.gov/pls/oshaweb/owadisp.
Meterlogic can provide an analysis of a ski area’s current show_document?p_id=9912&p_table=STANDARDS
system and determine how the company might be able to OSHA requirements for warning signs and protection from electric arc
utilize the metering equipment already in place, he added. https://www.osha.gov/laws-regs/standardinterpretations/2006-11-14
It’s also important to consult the National Electric Additional explanation of arc flash and how to avoid it
Code and National Fire Protection Association NFPA 70E. http://www.dfliq.net/arc-flash-happen-can-avoid
GET UP AND RUNNING FASTER
WITH ADG MOUNTAINSIDES 4 MONTHS !
BUILT IN
BUILDING THEM BETTER.
BUILT IN
BUILDING THEM FASTER. 5 MONTHS !
BUILT IN
3 MONTHS !
BUILT IN
BUILT IN
5 MONTHS !
BRANSON
MOUNTAIN
BUILT IN
4 MONTHS !
FIND OUT HOW
ADGMOUNTAINSIDES.COM
20 | NSAA JOURNAL | WINTER 2019
www.doppelmayr.com

