Page 22 - 86064_NSAA_W19_web
P. 22

Courtesy of Meterlogic  Safety  These two areas monitor    And, at the risk of stating the obvious, the analysis should
                                                                     be followed by thorough training of employees in the
                                          their system using a
                                          Schneider Electric power
                                                                     importance and use of PPE and the policies and procedures
                                          management solution called
                                                                     to support the safety programs. This training is critical, as
                                          Power Monitoring Expert
                                          (PME), said Jeff Keener,   is adherence to all federal, state, manufacturer, and ski area
                                                                     rules pertaining to the handling of high-voltage panels.
                                          business development           A thorough, exacting approach to electrical safety—
                                          specialist for Meterlogic.  combined with emerging technology designed to prevent
                                             “PME can utilize meter   hazards—is critical when it comes to keeping our employ-                                                     D-Line:
                                          information to provide     ees as safe as possible in their role of helping us run
                                          alarms and notifications,   the mountain.                                                                                                Welcome to first class
                                          and it can also be linked to
              A Meterlogic electrical measurement    the Meterlogic secure cloud   Further Resources
              safety tool installed on a power panel.
                                          hosting system, which      Personal Protective Equipment                                                                                 Doppelmayr defines the ropeway future: 205 new developments,
              allows for remote access from any computer screen for    https://ohsonline.com/Articles/2014/03/01/PPE-What-You-Need.aspx                                            including 31 innovations and 14 patent applications. The D-Line impresses
              complete viewing of your PME system,” Keener said. “PME   NFPA 70E Standard for Electrical Safety in the Workplace®                                                  with top ride comfort, ultramodern design and unsurpassed functionality.
              also provides easy-to-read and easy-to-use power manage-  https://www.nfpa.org/70E
              ment and power quality reports based on your needs     OSHA 1910.335 – Safeguards for Personnel Protection
              and timeframe.”                                        https://www.osha.gov/pls/oshaweb/owadisp.
                 Meterlogic can provide an analysis of a ski area’s current   show_document?p_id=9912&p_table=STANDARDS
              system and determine how the company might be able to   OSHA requirements for warning signs and protection from electric arc
              utilize the metering equipment already in place, he added.  https://www.osha.gov/laws-regs/standardinterpretations/2006-11-14
                 It’s also important to consult the National Electric   Additional explanation of arc flash and how to avoid it
              Code and National Fire Protection Association NFPA 70E.   http://www.dfliq.net/arc-flash-happen-can-avoid




                  GET UP AND RUNNING FASTER

               WITH ADG MOUNTAINSIDES                                                                4 MONTHS !
                                                                                                      BUILT IN



                                                             BUILDING THEM BETTER.
                                                                                                      BUILT IN
                                                             BUILDING THEM FASTER.                   5 MONTHS !



                                                                                                      BUILT IN
                                                                                                     3 MONTHS !




                                                                                                      BUILT IN
                                                                                                      BUILT IN
                                                                                                     5 MONTHS !
                                                                                                          BRANSON
                                                                                                          MOUNTAIN
                                                                                                      BUILT IN
                                                                                                     4 MONTHS !



                                                                                                     FIND OUT HOW
                                                                                                 ADGMOUNTAINSIDES.COM




              20  |  NSAA JOURNAL  |  WINTER 2019
                                                                                                                                          www.doppelmayr.com
   17   18   19   20   21   22   23   24   25   26   27