Page 7 - 14th @ Irving Basis of Design (internal)
P. 7

  Establish a building security and access plan that supports the project goals and SMART strategy
              Confirm how the current MEP systems will support future workplace diversity and flexibility


        GOAL THREE

        CREATE AN ASSET THAT IS SMART, COST-EFFECTIVE, AND RESILIENT TO OPERATE
        This building will be designed to last for 100+ years and will change and evolve over time. The building will need to support smart
        cost-effective building operations, dynamic tenant needs, and changes in the marketplace to become a valuable long-term real-
        estate asset.

            DETAILS:
            1   Establish a building monitoring and control system that allows the building operators to confirm and continuously deliver
               the smart, healthy, and sustainable project goals.
            2   Design a building that saves 30% annual energy cost compared to the NYC code baseline (when including tenant savings)
            3   Incorporate all of the relevant resiliency design strategies outlined in the NYC Climate Resiliency Design Guidelines


            ACTION ITEMS:
              Integrate the SMART, BMS, commissioning, and operations plans to support smart building operations and management
              Evaluate and incorporate cost-effective passive and active strategies for reducing energy costs and carbon impacts
              Identify and assess relevant resiliency design strategies and quantify the design and cost impacts of each


        1.3  NEXT STEPS


        The design goals above summarize our understanding of the development team’s aspirations and intentions for the project design.
        To achieve these goals while delivering the project on time, on budget, and on schedule, the design team will need to complete a
        comprehensive review of the current design intent, as outlined below, and quickly discuss the impacts, decisions, and integration
        needed. The following is a high-level summary of recommended next steps to support an integrative design process in the Design
        Development and Construction Document phases.

            1   Each discipline on the design and development team shall review and comment on this report and the design direction
               articulated within. Review shall focus on clarifying design direciton and coordination needed in the DD phase.
            2   WSP and DBB shall identify focus areas for further discussion, assessment, and integration to achieve the project goals
               above
            3   RAL shall provide decisions and direction for the above goals and focus areas.
            4   Identify champions for each item above.
            5   WSP’s Built Ecology team will facilicate the ongoing discussion related to the project goals and update the goals at the end

               of the DD phase.

















        14th @ IRVING                                                                                             WSP
        Project No.  B1809809.000
        RAL COMPANIES & AFFILIATES                                                                              Page 7
   2   3   4   5   6   7   8   9   10   11   12