Page 80 - 14th @ Irving Basis of Design (internal)
P. 80
Notes: Notes:
22 6 3 3 14 8 100
3
3
3
9 6 3 6 6 3 3 8 6/4/2 2 4 6
Points Available: Points Available: Total Points Awarded:
Diverse POE's from different streets Diverse POE's from the same street Elevated telecom equipment above the floor plain Building is located above the floor plain Back-up generator connection Back-up generator power to MER/TRs Section 3: Wireless Network Infrastructure Lateral from Telecommunications Room to the Riser Option A: 300 sq ft minimum DAS head end room Option B: RF survey that meets 2 cell provider KPIs Wi-Fi Coverage Wi-Fi provided in common areas/amenity spaces Fixed Wireless Preparation One (1) 3" conduit to the roof Section 4: Readiness and Access Policies and Procedures for Carrier Negotiation
Total
2.3 2.4 3.1 3.2 3.3 4.1 4.2
0 N 0 N 0
3 6 ? 6 0 ? 12
3 6 Y 3 3 14 Y 8 6 88