Page 79 - 14th @ Irving Basis of Design (internal)
P. 79

Diverse POE's from different streets  9  6 Diverse POE's from the same street  3 Elevated telecom equipment above the floor plain Building is located above the floor plain  3 Back-up generator connection  3  3 Back-up generator power to MER/TRs  22 Points Available:   Section 3: Wireless Network Infrastructure  Notes:  6 Lateral from Telecommunications Room to the Riser  6 Option A: 300 sq ft minimum DAS head end room  6 Option B: RF survey that meets 2 cell provider KPIs  Wi-Fi Coverage  3  3 Wi-Fi provided in common areas/amenity spaces  3 Fixed Wireless Preparation  3 One (1) 3" conduit to the roof  14 Points A



















                                                                                                                     Total

                   2.3    2.4                    3.1        3.2    3.3                    4.1    4.2
                                      0      N                                 0      N                             0


                          3           6      ?   6                             0      ?                             12
                   3                  6      Y              3       3          14     Y   8       6                 88
   74   75   76   77   78   79   80   81   82   83   84