Page 79 - 14th @ Irving Basis of Design (internal)
P. 79
Diverse POE's from different streets 9 6 Diverse POE's from the same street 3 Elevated telecom equipment above the floor plain Building is located above the floor plain 3 Back-up generator connection 3 3 Back-up generator power to MER/TRs 22 Points Available: Section 3: Wireless Network Infrastructure Notes: 6 Lateral from Telecommunications Room to the Riser 6 Option A: 300 sq ft minimum DAS head end room 6 Option B: RF survey that meets 2 cell provider KPIs Wi-Fi Coverage 3 3 Wi-Fi provided in common areas/amenity spaces 3 Fixed Wireless Preparation 3 One (1) 3" conduit to the roof 14 Points A
Total
2.3 2.4 3.1 3.2 3.3 4.1 4.2
0 N 0 N 0
3 6 ? 6 0 ? 12
3 6 Y 3 3 14 Y 8 6 88