Page 254 - 2006 HARLEY FLSTCI SERVICE MANUAL
P. 254

5-35



                                           Repair open (GY) wire between   NO  Repair/Replace engine stop




                                      NO    connector [22] and fuse.  switch or wiring.                                                                 2006 Softail: Engine Management (EFI)










                       Continued from Test 5.11 (Part 1 of 2).  Measure voltage at terminal 3 (BK) of  Breakout Box. Battery voltage present?  YES  With ignition ON, Measure  voltage at terminal 4 (BK). Bat- tery voltage present?  YES  Repair open circuit on W/BK wire  between ECM and connector [22A].  Clear codes using speedometer self diagnostics. SPEEDOMETER SELF DIAGNOSTICS. Confirm proper operation with no check engine














                          2                                                      5.6   See   lamp.





             Test 5.11 (Part 2 of 2)  NO ECM POWER









         HOME
   249   250   251   252   253   254   255   256   257   258   259