Page 10 - RoadCem Working Platforms for Piling Case Studies_Neat
P. 10

New Bridge at Walton on Thames

    ● RoadCem used for access, working platforms and
      compounds/laydown areas.
    ● 900mm diameter CFA piles installed through RoadCem platform.
    ● Large tracked cranes operated on RoadCem platforms to lift bridge
      components in place.
    ● RoadCem mat returned to soil upon completion of project and
      landscaped.
    ● Use of RoadCem saved £millions on this project and was
      considered by the Client to be the only effective working platform
      construction method in the very soft alluvium soils without being
      able to raise levels due  to risk of flooding risk and also not being
      able to excavate too deeply due too high groundwater levels.
    ● Local residents benefited from greatly reduced HGV movements.