Page 12 - EOSedge installation Documents
P. 12
EOS 90395-A-PHY-0002-Column feet assembly & setting
10. DRILLING THE FIRST 16 HOLES – PRIMARY SIDE
a. Choose Choose a side (frontal or profile) to start the drilling process,
preferably the side with the least number of shims. This will be your ‘Primary
side’ and your point of reference for future measurement.
b. Leave the Nivells, the leveling plates and the crossbar in place while drilling.
This may improve your accuracy during the drilling process.
c. Here are the tools you will need:
I. Hammer drill SDS Max
II. 32+ M16x150-190 anchor bolts Hilti HAS-U 8.8 HDG
III. Vacuum cleaner
IV. 18mm drill bit
V. Blower