EOS 90395-A-PHY-0002-Column feet assembly & setting
1. Column feet assembly & setting
2. Preliminary requirements
3. Tools and Materials - Make sure to receive on site all necessary tools and materials required for
the pre-installation process.
a. Package 1: Wooden crate containing the NIVELL, Levelling plates and shims – Non-returnable
b. Package 2: Wooden box containing installation materials: inclinometers, torque wrenches,
anchors, injectable adhesive, etc. - Returnable
c. Package 3: Wooden crate containing leveling crossbar, aluminum bars for columns centering,
etc. - Returnable
d. Package 4: Carboard container with 2 aluminum floor templates – Returnable