Page 275 - PPAP submission requirements (PPAP check sheet)
P. 275

SUPPLIER SELF ASSESSMENT



    SUPPLIER NAME :      THAI EPP FOAM CO., LTD.                                                 DATE ASSESSMENT :               29/4/2020
    PRODUCT (PART NAME) :      49404-A0010-A TRAY, TOOL KIT                                      ASSESSOR :                      K.TANONGSAK

    Evaluation scoring
           [4] Well established and implemented effectively                                      Rules;
           [3] Established but not well implement                                                1) Suppliers must assess themselves in all truthfulness.
           [2] Not established but implementation                                                2) Suppliers must respond to the assessment form and attach documents as evidence of existence and actual use.
           [1] Have system/procedure but not impement                                            3) Supplier well note that if their score lessthan 60% They must be respond to the assessment with action plan(by item)
           [0] No system/procedure, no actual operation/activity
         N.A. Not applicable

                                                                  Supplier                                  MINE
    Evaluation Items                                                                                                                          Expectation
                                                 Score         Comment and Evidence         Score      Comment and Evidence
    1.8 Is quality policy by top management defined clearly   4  We have quality policy defined and deployed   0                 Have quality policy defined and deployed and
        and deployed to all sections?                 to section by KPI                                                          known by related parties(as a document)


     1.9 Do the inspection procedures consist with   4  We Have inspection standard was approved   0                             Have inspection standard was approved by
        inspection standards approved by customer in   by customer and procudure control.                                        customer and implement at your production
        sampling frequency, criteria, measurement                                                                                process
        instrument etc ?
    2.QUALITY CONTROL / QUALITY IN PROCESS
     2.1 Do you have Working instruction (Inspection   4  We have working instruction (WI) All Process.  0                       Clear working instruction (inspection
        instruction) for this?                                                                                                   instruction) with photo (or picture) put in front
                                                                                                                                 of operator and can be found training records
     2.2 Are necessary amendments implemented as   4  We have format registration number, revision   0                           Can visualize the format registration number,
        defined? Are the newest versions?             number, effective date on the document.                                    revision number, effective date on the
                                                                                                                                 document

     2.3 Is this working instruction (inspection instruction)    4  All checking points in working instruction   0               All checking points in working instruction
        coherent with control plan ?                  matching with process flow diagram & Control.                              (inspection instruction) are coherent with
                                                                                                                                 control plan, and matching with process flow
                                                                                                                                 diagram
     2.4 Do you have check sheet for checking points   4  We have daily check sheet with working   0                             Have daily check sheet coherent with working
        records?                                      instruction.                                                               instruction (inspection instruction)


    2.5 Do the critical and safety characteristics have   We have the critical and safety characteristics                        SPC graph with OK tolerance, process
        sufficient process capability ?               have sufficient process capability SPC graph                               capability with action rule is clearly displayed
                                                   4  with OK tolerance, process capability.  0                                  somewhere in plant.