Page 276 - PPAP submission requirements (PPAP check sheet)
P. 276

SUPPLIER SELF ASSESSMENT



    SUPPLIER NAME :      THAI EPP FOAM CO., LTD.                                                 DATE ASSESSMENT :               29/4/2020
    PRODUCT (PART NAME) :      49404-A0010-A TRAY, TOOL KIT                                      ASSESSOR :                      K.TANONGSAK

    Evaluation scoring
           [4] Well established and implemented effectively                                      Rules;
           [3] Established but not well implement                                                1) Suppliers must assess themselves in all truthfulness.
           [2] Not established but implementation                                                2) Suppliers must respond to the assessment form and attach documents as evidence of existence and actual use.
           [1] Have system/procedure but not impement                                            3) Supplier well note that if their score lessthan 60% They must be respond to the assessment with action plan(by item)
           [0] No system/procedure, no actual operation/activity
         N.A. Not applicable

                                                                  Supplier                                  MINE
    Evaluation Items                                                                                                                          Expectation
                                                 Score         Comment and Evidence         Score      Comment and Evidence
    2.6 Do you have check sheet for OK Start of Poka-  We don’t have Poka-yoke but we have                                       Daily check sheet of Poka-yoke
        yoke                                          Moulding machine maintenance daily check                                   or test equipment (cleaning, dammy check,
        or test equipment?                         3  sheet before start work.               0                                   emergency button check,...) record before
                                                                                                                                 start work
     2.7 Are the process control parameters recorded ?  4  We have Parameters recorded and training   0                          Have daily check sheet of process control
                                                      attendance.                                                                parameter (coherent with control plan)



    3. CORRECTIVE ACTION
    3.1 Do you have pareto for tracking  (even from the   3  We have pareto for tracking for management   0                      Weekly tracking chart with pareto by causes
        next process as customer)?                    review.                                                                    for claim displayed somewhere in plant.


    3.2 Do you have action plan for Top management    We have action plan for Top management                                     PDCA exist for Top management meeting.
        meeting?                                      meeting.                                                                   Problems completely killed after action.
                                                   4                                         0

    4. NON-CONFORMING PARTS MANAGEMENT
    4.1 In case of NOK, do you scrap or rework/repair   We have procedure Nonconforming product                                  Operator respect their instruction sheet with
        parts?                                        control, Rework and WI.                                                    boundary sample which is clearly showing
                                                   4                                         0                                   "Scrap or rework/repair" and have records

    4.2 How do you distinguish scrap and repair?      We have procedure QC Hold & WI                                             Scrap parts go to red box; repair parts to
                                                      Nonconforming product control.                                             repair place with identification and records
                                                   4                                         0

    4.3 How do you repair your parts?                 We have procedure QC Hold & WI                                             Working instruction sheet for repair is clearly
                                                      Nonconforming product control.                                             displayed, including which parts can be reuse,
                                                   4                                         0                                   where they return repaired parts
   271   272   273   274   275   276   277   278   279   280   281