Page 280 - PPAP submission requirements (PPAP check sheet)
P. 280

MINE MOBILITY CORPORATION  CO, LTD. (MMC)


               Phase 1  Phase 2   Phase 3           PPAP Submission Warrant Status
             PART INFORMATION
             Model     SPA1                                    Customer   MINE MOBILITY CORPORATION  CO, LTD.
             Part Name  TRAY,TOOL KIT                            Cust. Part Number  49404-A0010-A
             Shown on Drawing Number  49404-A0010-A              Organization Part Number  -
             Engineering Change Level      -                         Date     -
                                                                               -
             Additional Engineering Changes   -                      Date     -
             Optional Tracking Number
             Safety and/or Government Regulation  Yes  No   Purchase Order No.  -    Weight (g) 295 g.
             Checking Aid Number  -       Checking Aid Change Level      -              Dated  -
             ORGANIZATION MANUFACTURING INFORMATION
             THAI EPP FOAM CO., LTD.                           MANEELUCK SUCHAIRATTANACHOK / SQE
             Organization Name and Supplier Code               Customer Name/Division
             60/119 Moo.19  Khlong Nueng Subdistrict           -
             Street Address                                    Buyer/Buyer Code
             Khlong Luang District, Pathum Thani Bangkok 12120  Ms. Narissara Promrug
             City      Region   Postal Code    Country         Application
             REASON FOR SUBMISSION
                  Initial submission                                Change to Optional Construction or Material
                  Engineering Change(s)                             Sub-Supplier or Material Source Change
                  Tooling: Transfer, Replacement, Refurbishment, or additional  Change in Part Processing
                  Correction of Discrepancy                         Parts produced at Additional Location
                  Tooling Inactive > than 1 year                    Other - please specify below
             REQUESTED SUBMISSION LEVEL (Check one)
                  Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.
                  Level 2 - Warrant with product samples and limited supporting data submitted to customer.
                  Level 3 - Warrant with product samples and complete supporting data submitted to customer.
                  Level 4 - Warrant and other requirements as defined by customer.
                  Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.
             SUBMISSION RESULTS
             The results for  Dimentonal measurements       Material and function tests       Appearance criteria  Statistical process package
             These results meet all drawing and specification requirement :  Yes  No (If "NO" - Explanation required).
             Mold / Cavity / Production Process :   1 MOLD K813/2 CAVITY/ INJECTION PROCESS
             DECLARATION and SUBMISSION RESULTS
             I affirm that the samples represented by this warrant are representative of our parts which were made by a process which meets all
             current edition Production Part Approval Process Manual requirements including all Mine-specific requirements.  I further affirm that
             these samples were produced at the production rate of   _114 pcs. / 8 (24) _  hours using                  production streams.  I also certify that
             documented evidence of such compliance is on file and is available for review.  I have noted any exceptions from this declaration below.
             EXPLANATION/COMMENTS

             List Molds / Cavities / Production Processes:
              (Attach a separate page if additional space is necessary)
             Supplier Authorized Signature                                          Date   28-Jan-20
             Print Name  Mr. Tanongsak Chuayta     Phone No. 097-328-2926       Fax.    038-490-323
             Title     Engineering                   Email  tanongsak@thaifoamgroup.com

             FOR Mine USE ONLY                                          Interim Status (to be completed by Supplier)
                                                       a/
                                                                        Interim
                                      PPAP     .                             Non-PPAP                 .
              Phased PPAP     Approved                  Interim         Submission:
              Warrant Status:                   Rejected  Accepted
                                                                        Engineering
                                                 Date                   Authorization:
               Customer Signature                                       .                     .
                                                                        Description:
               Print Name                                         .                                                    .
                                                                        (Incomplete PPAP
                                                                         Requirements)                                      .
               a/  Non-PPAP indicates the part does not satisfy one or more PPAP requirements
                    and is considered incomplete  until all PPAP requirements are satisfied.
                                               The original copy of this document shall remain at the
                                                  supplier's location while the part is active
            Route : Supplier                  Mine Approve (Copy)                 Supplier  For  : Supplier
                                                                                                      SQAM - 1
   275   276   277   278   279   280   281   282