              Overhead            In addition to the meter base/socket requirements earlier in this chapter, meter bases/
                                  sockets for 200 A overhead services shall:
                                  •   Be rated for 120/240 V and 200 A.
                                  •   Contain four meter jaws and one connection point for the neutral conductor.

              Outbuildings        Meter bases/sockets for 200 A (or less) services to single-family residential use
              (overhead or        outbuildings (such as garages, shops, single-family wells, or noncommercial barns)
              underground         must meet all the requirements listed in this chapter for either underground or
              service)            overhead services.
                                  NOTE: If an outbuilding is used for a commercial operations, please refer to PSE’s
                                  Electric Service Handbook, Commercial/Industrial and Multifamily Projects as you will
                                  have additional requirements including customer-provided service conductor and a
                                  manual bypass meter base/socket.

              Figure 29           Residential meter socket wiring diagrams




                             UNDERGROUND                                             OVERHEAD
                                                                                          SERVICE LINE TO WEATHERHEAD
                               11" MIN                                                    (CUSTOMER PROVIDED)

                                                 METER SOCKET
                                                 MUST BE                                   2" RIGID STEEL OR
                                                 GROUNDED                                  2-1/2" PVC CONDUIT
                                                 ACCORDING
                                                 TO NEC
                                                                                                       METER SOCKET
                                                                                                       MUST BE
                                                                                                       GROUNDED
                                                   NEUTRAL LUG                                         ACCORDING
                                                                                                       TO NEC
               14"
               MIN                                 ALTERNATE
                                                   NEUTRAL LUG
                                                   POSITION
                                                                                                         NEUTRAL LUG
                                                                                                         ALTERNATE
                                                                                                         NEUTRAL LUG
                                                                                                         POSITION


                                                  2" RIGID STEEL OR
                    CUSTOMER WIRE                 2-1/2" PVC CONDUIT,
                                                  CUSTOMER PROVIDED
                                                  SERVICE LINE
                                                  (PSE PROVIDED)
                                                                                      CUSTOMER WIRE