Page 56 - Puret Sound Energy Hand Book 1218
P. 56

Chapter 5



               Meter bases/sockets

               General              The meter base/socket you purchase and install shall meet the following general
               requirements         requirements:
                                    •   Be a ring-type socket that includes a screw-type, stainless steel, or aluminum
                                        meter ring (snap-type rings must be stainless steel).
                                    •   Be Underwriters Laboratories (UL) approved.
                                    •   Be rated for exterior use and be rain-tight according to NEMA-3R.
                                    •   Have all unused openings tightly sealed from the inside of the socket.
                                    •   Be plumb and securely fastened to the supporting structure.
                                    •   Have a cover that is securely attached to the meter base/socket case.
                                    NOTE: Meter base/socket and current transformer enclosures shall not be used as a
                                    junction box.

               Meter base/          For single-family residences and manufactured and mobile homes, you are required
               socket location      to install your meter base/socket in a place that is accessible to PSE. All locations
                                    are subject to approval by a PSE Representative. If you have questions regarding
                                    meter locations, call your CCS Representative.
                                    Meter bases/sockets and current transformer (CT) enclosures must be located:
                                    •   Outside.
                                    •   On the front one-third of your home closest to normal public access.
                                    •   In an area that is not subject to being fenced or walled in (such as patios, decks,
                                        porches, breezeways, backyards, and carports).
                                    •   On a structure that is owned by you.
                                    These locations allow PSE to:
                                    •   Read your meter in a cost-effective manner.
                                    •   Maintain your meter efficiently.
                                    •   Disconnect your service in case of fire.
                                    Meter location information is provided in the Electric Underground Service Installation
                                    Requirements handout.

               Grounding            All meter bases/sockets, enclosures, and conduit shall be bonded and grounded in
               requirements         accordance with the NEC.























               Electric Service Handbook 2017 — Single-Family Residential Projects                          47
   51   52   53   54   55   56   57   58   59   60   61