Chapter 6


              Meter socket requirements


                                    Customer-provided metering equipment shall meet the requirements stated in
                                    Chapter 5 of this handbook. Installers may not tap at or in the meter socket
                                    (supply side tap).


              Labeling requirements


                                    All meter sockets shall be labeled with permanently affixed signage at the
                                    production meter and net meter enclosures to identify their function (i.e., net meter
                                    or production meter). Where metering is accomplished at different voltages, the
                                    signage must also identify the voltages at which the meters are energized. Labels
                                    shall conform to the requirements of NEC article 690.
                                    NOTE:  Felt-tip pens and label marker tape are not considered permanent marking.



              Disconnect switch requirements


                                    PSE must have the ability to disconnect a generator from PSE’s system for
                                    employee protection. A disconnect switch is recommended to be installed for all
                                    customer generation systems, and required in some cases.
                                    A disconnect switch is required if your system meets any of the following
                                    characteristics:
                                    •   Output is greater than 25 kW
                                    •   Electric service is three-phase
                                    •   Electric service is CT-metered
                                    A disconnect switch is optional if your system meets all of the following characteristics:
                                    •   Output is 25 kW or less
                                    •   Electric service is single-phase
                                    •   Electric service is self-contained

              Disconnect            When a production system requires a disconnect switch, the following criteria shall
              switch location       be applied to determine the location of the disconnect switch:
                                    •   For 240 V and 120/208 V self-contained and CT-rated production meters, the
                                        disconnect switch shall be on the line side of the production meter (between the
                                        production meter and the inverter).
                                    •   For customers that have no load between the PSE transformer and inverter
                                        (typically community solar or power purchase customers), only one bidirectional
                                        meter is necessary to monitor production credits and inverter load. The
                                        disconnect switch shall be on the load side of the generation/service meter
                                        (between the meter and the inverters).
                                    •   When more than one production meter is required for the customer production
                                        system, the disconnect location shall be determined by PSE Meter Engineering.