Chapter 7



               Trenching and        It is the customer’s responsibility to provide the trenching needed to connect to a
               excavation           power stubout (shown in Figure 34). The cable you provide is to be sized according
               requirements         to the NEC and have a minimum 24 inches of backfill coverage.
                                    NOTE: A 4-foot-square excavation is required at the stubout to provide working
                                    room for our personnel to splice your cable to ours.
                                    If the connection point to PSE facilities is a handhole, pedestal, or transformer;
                                    trench up to the nearest side and leave your wires exposed. If you discover any other
                                    conductors while digging your trench, please leave them covered.
                                    Remember to order underground utility locate service by contacting the 811 “Call
                                    Before You Dig” hotline two business days before digging.
                                    NOTE: Any trenching within 24 inches of existing underground facilities must be
                                    done by hand.

               Figure 34            Trenching requirements for power stubout





                                                       CUSTOMER POST, METER
                                                           BASE, AND PANEL

                                                                             6' MAX
                                                                             5' PREFERRED
                                                                             4' MIN
                                             PSE STUBOUT
                                          STUBOUT CONDUIT
                                             COVERING THE
                                              TEMPORARY
                                              CONNECTION
                                                                  26"
                                                                                      CUSTOMER OWNED
                                                                                      TEMPORARY SERVICE
                                                                                      CONDUCTORS

                                                                              4'
                                                           4'
                                         PSE CONDUCTOR




                                     NOTE: 4' x 4' work pit is required to allow working room for the tools necessary
                                     to connect temporary service.