Chapter 7


              Figure 37           Temporary overhead service installation





                                      8
                                                   6
                                                                                 TOP VIEW OF STUD AND BRACES
                              ALIGN SERVICE LINE BETWEEN BRACES.
                           MAX 70' IN LENGTH WITHOUT PSE APPROVAL.
                                                             7

                                                                       1               45˚

                                                                       2

                                                  10' MIN             9
                                                  TO DRIP
                                                   LOOP
                                                12'                   3
                                                MIN                              NOTE THAT THE SERVICE LINES
                                                                                 EXTEND AT A 45˚ ANGLE FROM
                                                                                 WITHIN THE BRACES.
                                                         6' MAX
                                                       5' PREFERRED
                                                         4' MIN
                                                                    4
                                        5




                         GROUND LINE               24" MIN


                                                      8' MIN








                          Items owned and installed by customer          Items owned and installed by PSE
                           4" x 4" x 16' or 2" x 10" x 16' minimum,   8   Service line
                        1
                           continuous single structure               9    Meter
                           Meter socket and distribution panel (up to
                        2
                           200 A, 120/240 V)
                        3  Ground wire, in accordance with NEC/WAC
                        4  Ground rod(s), in accordance with NEC/WAC
                        5  2" x 4" brace (two required)
                           Service entrance conductors  - 18" out of
                        6
                           weatherhead minimum
                        7  Insulated clevis (point of attachment)








               Electric Service Handbook 2017 — Single-Family Residential Projects                          66