Page 74 - Puret Sound Energy Hand Book 1218
P. 74
Chapter 7
Figure 36 Minimum clearance requirements upon installation
SERVICE LINE
(UTILITY OWNED)
TEMPORARY
SERVICE
26'
17-1/2'
12' 10'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, RESIDENTIAL
DRIVEWAYS, AND PARKING AREAS NON-TRAFFIC PROPERTY
Overhead The following items must be completed before we can energize your service:
temporary 1. Contact a CCS Representative and request your temporary overhead service.
service
installation 2. Obtain an electrical work permit from the inspecting agency.
process 3. Install a meter pole and meter socket.
4. Obtain and pass an electrical inspection.
5. After these items are completed, call CCS and inform a CCS Representative at
1-888-321-7779 that your installation has been inspected and that you are ready
for temporary service.
Figure 37 shows the standard temporary overhead service installation that we
recommend. The dimensions shown are the minimum acceptable.
This installation shows a safe temporary service. Do not deviate from the installation
standards without approval from your CCS Representative. Doing so may extend the
time frame for your service hookup.
Electric Service Handbook 2017 — Single-Family Residential Projects 65