               Figure 36           Minimum clearance requirements upon installation











                                                        SERVICE LINE
                                                        (UTILITY OWNED)




                                                                                                   TEMPORARY
                                                                                                    SERVICE
                                                      26'
                                                                     17-1/2'
                                                                                             12'         10'


                                                  STATE HIGHWAYS  STREETS, ALLEYS, COUNTY ROADS,   RESIDENTIAL
                                                               DRIVEWAYS, AND PARKING AREAS  NON-TRAFFIC PROPERTY


              Overhead            The following items must be completed before we can energize your service:
              temporary           1.  Contact a CCS Representative and request your temporary overhead service.
              service
              installation        2.  Obtain an electrical work permit from the inspecting agency.
              process             3.  Install a meter pole and meter socket.

                                  4.  Obtain and pass an electrical inspection.
                                  5.  After these items are completed, call CCS and inform a CCS Representative at
                                     1-888-321-7779 that your installation has been inspected and that you are ready
                                     for temporary service.
                                  Figure 37 shows the standard temporary overhead service installation that we
                                  recommend. The dimensions shown are the minimum acceptable.
                                  This installation shows a safe temporary service. Do not deviate from the installation
                                  standards without approval from your CCS Representative. Doing so may extend the
                                  time frame for your service hookup.