                       In the 1980s Collen shifted its focus from civil engineering to construction management, and
                       the company continued to build on a strong client base that included both private and public
                       sector clients.


                                 Hugh Lane Gallery                          Fonthill Industrial Units

                     Refurbishment and Extension works to Hugh     Collen Construction has completed in excess
                     Lane  Gallery.  The  Hugh  Lane  Gallery  is  a   of  20  industrial  and  retail  units  within  the
                     protected  structure  and  required  extensive   Fonthill Retail Park. The cumulative value of
                     works  including  basement  and  heating      the projects is in the region of €65 Million
                     system  upgrades.  Fire  safety  related  works   and  negotiations  are  ongoing  for  future
                     also required an upgrade of main entrance.    projects with this Client.


















                               UCD Student Residence                      Gateway Development

                     Management  and  co-ordination  of  all     Design  and  Build  of  €100  Million  landmark
                     aspects  of  the  construction  of  this  5/6   Multi-Storey  commercial  office  and  retail
                     storey   student   accommodation    with    development  comprising  of  five  separate
                     detached student facilities building and site   blocks  with  integrated  basement  car-
                     development  works  within  existing  UCD   parking.  A  fast-tracked  programme  was
                     University  Campus.  This  project  was  fast   facilitated  by  incorporating  a  permanent
                     tracked  by  incorporated  a  permanent     formwork system on piled foundations. The
                     formwork system into the design.            project  incorporated  raised  access  floors
                                                                 and a high specification fit-out.