Page 207 - E:\CloudStation\Project\1 DONE\Ranhill CIMAH\Flip Book\
P. 207
TRAINING & DEVELOPMENT PLAN 2019
TARGET TOTAL TOTAL
NO CLASS TITLE TRAINER DURATION JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
GROUP STAFF GROUP
WATER TREATMENT
1 WATER TREATMENT OPERATION (BASIC) CPD/QA/SAJIC/ PROD 2 DAYS 24&25
ADMIN/CS/NET/WTP CREW
2 WATER TREATMENT OPERATION (COMPETENCY TRAINING) WTP EXEC, TECH & OP PROD 134 4 3 DAYS 19-21 (G1) 16-18(G2) 16-18(G3) 2-4(G4)
3 WATER TREATMENT OPERATION: SLUDGE HANDLING OPERATION WTP EXEC, TECH & OP PROD 134 4 2 DAYS 10&11(G1) 26&27(G2) 26&27(G3) 20&21(G4)
4 PRODUCTION CONTROL SYSTEM (REFRESHER) M&E / A&T / IT IT TBA TBA 1 DAY 4
5 PRODUCTION CONTROL SYSTEM: MOBILE ONLINE IT VENDOR TBA TBA TBA 2
6 SAFE HANDLING OF CHEMICAL WTP INTERNAL 500 17 1 DAY 12(G1) 10(G3),11(G4) 25(G7) 23(G9),24(G10) 5(G13),6(G14) 8(G17)
13(G2) 24(G5),25(G6) 26(G8) 30(G11),31(G12) 24(G15),25(G16)
7 SHUTDOWN PLANNING AND MANAGEMENT EXEC, PROD EXTERNAL
WATER DISTRIBUTION
1 INTEGRATED JOB MANAGEMENT SYSTEM SAJIC & UPIP IT TBA TBA 1 DAY 18
WATER LOSS MANAGEMENT
1 AQUASMART: DMA MONITORING NRW / NET RWS TBA TBA TBA 28
2 AQUASMART: APMC MONITORING NRW / NET RWS TBA TBA TBA 29
3 AQUASMART: RESERVOIR MONITORING NRW / NET / M&E RWS TBA TBA TBA 21
4 AQUASMART: ONLINE PRESSURE MONITORING NRW / NET RWS TBA TBA TBA 28
5 AQUASMART: PRODUCTION BAND & RESERVOIR OUTLET METER NRW / PROD / NET / M&E RWS TBA TBA TBA 4
6 AQUASMART: BIG CUSTOMER METER NRW / CS / M&E RWS TBA TBA TBA 30
7 AQUASMART: NRW STOCK TRACKING SYSTEM NRW RWS TBA TBA TBA 3
8 AQUASMART: NRW JOB MANAGEMENT SYSTEM NRW / NET / CS RWS TBA TBA TBA 26
9 AQUASMART: SMART DMA NRW RWS TBA TBA TBA 27
10 AQUASMART: GUSSMAN RMS NET / M&E RWS TBA TBA TBA 4
11 AQUASMART: COMMERCIAL LOSS MONITORING SYSTEM NRW / CS / NET RWS TBA TBA TBA 9
MECHANICAL & ELECTRICAL ENGINEERING
1 WORKSHOP ON ENMS DATA REPORTING EXEC, TECH & CLERK, M&E ENERGY MANAGER 46 2 1 DAY 10(G1) 2(G2)
2 MEASUREMENT & CALIBRATION SYSTEM EXEC M&E SIRIM 42 2 TBA 4(G1)
18(G2)
3 INSTRUMENT (FLOW METER, ANALYZER ETC) EXEC M&E EXTERNAL 43 2 TBA 3(G1) 18(G2)
4 MECHANICAL (PUMP, VALVE, PIPES ETC) EXEC & TECH M&E EXTERNAL 42 2 TBA 21(G1) 20(G2)
5 DOSING EQUIPMENT MAINTENANCE EXEC M&E EXTERNAL 42 2 TBA 18(G1) 24(G2)
6 ELECTRICAL (MOTOR, MCCB, TRANSFORMER ETC) EXEC M&E EXTERNAL 43 2 TBA
QUALITY MANAGEMENT
1 DOCUMENT CONTROL PERSON NEW DCP QA 2 DAYS 16&17
2 DOCUMENT CONTROL PERSON (REFRESHER) DCP QA 1 DAY 10
3 ISO 9001:2015 QUALITY MANAGEMENT SYSTEMS (AWARENESS) EXEC, TECH & CLERK QA 30 1 0.5 DAY 3
4 ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS EXEC & ABOVE SIRIM STS TBA 1
(AWARENESS)
5 ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS TECH, OP & CLERK QA / HSE 0.5 DAY 23
(AWARENESS)
ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS:
6 INTERNAL AUDITING AUDITOR SIRIM STS TBA 1
7 ISO 50001:2018 ENERGY MANAGEMENT SYSTEM: INTERNAL AUDITING AUDITOR SIRIM STS TBA 1
ISO/IEC 27001:2013 INFORMATION SECURITY MANAGEMENT SYSTEMS
8 IT / CS IT 6 1 0.5 DAY 22
(AWARENESS)
9 ISO/IEC 17025:2017 SKIM AKREDITASI MAKMAL MALAYSIA (AWARENESS) WQ EXTERNAL 0.5 DAY 22
WATER QUALITY
1 WATER SAMPLING PROCESS (REFRESHER) ALL WQ STAFF WQ 45 2 1 DAY 14(G1)
15(G2)
2 WATER QUALITY CONTROL (REFRESHER) ALL WQ STAFF WQ 45 2 1 DAY 6(G1)
7(G2)
3 WATER SAFETY PLAN (REFRESHER) ALL WQ STAFF WQ 45 2 1 DAY 8(G1)
9(G2)
4 TECHNICAL EQUIPMENT AND WATER TESTING WQ, M&E ARACHEM 11 1 TBA 4