Page 208 - E:\CloudStation\Project\1 DONE\Ranhill CIMAH\Flip Book\
P. 208

TRAINING & DEVELOPMENT PLAN 2019

 TARGET  TOTAL   TOTAL
 NO  CLASS TITLE  TRAINER  DURATION  JAN  FEB  MAR  APR  MAY  JUN  JUL  AUG  SEP  OCT  NOV  DEC
 GROUP  STAFF  GROUP
 WATER TREATMENT
 1  WATER TREATMENT OPERATION (BASIC)   CPD/QA/SAJIC/  PROD  2 DAYS  24&25
 ADMIN/CS/NET/WTP CREW
 2  WATER TREATMENT OPERATION (COMPETENCY TRAINING)   WTP EXEC, TECH & OP  PROD  134  4  3 DAYS  19-21 (G1)  16-18(G2)  16-18(G3)  2-4(G4)
 3  WATER TREATMENT OPERATION: SLUDGE HANDLING OPERATION   WTP EXEC, TECH & OP  PROD  134  4  2 DAYS  10&11(G1)  26&27(G2)  26&27(G3)  20&21(G4)
 4  PRODUCTION CONTROL SYSTEM (REFRESHER)  M&E / A&T / IT  IT  TBA  TBA  1 DAY  4
 5  PRODUCTION CONTROL SYSTEM: MOBILE ONLINE  IT  VENDOR  TBA  TBA  TBA  2
 6  SAFE HANDLING OF CHEMICAL  WTP  INTERNAL  500  17  1 DAY  12(G1)  10(G3),11(G4)  25(G7)  23(G9),24(G10)  5(G13),6(G14)  8(G17)
                                     13(G2)  24(G5),25(G6)  26(G8)  30(G11),31(G12)  24(G15),25(G16)
 7  SHUTDOWN PLANNING AND MANAGEMENT  EXEC, PROD  EXTERNAL
 WATER DISTRIBUTION
 1  INTEGRATED JOB MANAGEMENT SYSTEM  SAJIC & UPIP  IT  TBA  TBA  1 DAY  18
 WATER LOSS MANAGEMENT
 1  AQUASMART: DMA MONITORING  NRW / NET  RWS  TBA  TBA  TBA  28
 2  AQUASMART: APMC MONITORING  NRW / NET   RWS  TBA  TBA  TBA  29
 3  AQUASMART: RESERVOIR MONITORING  NRW / NET / M&E  RWS  TBA  TBA  TBA  21
 4  AQUASMART: ONLINE PRESSURE MONITORING  NRW / NET  RWS  TBA  TBA  TBA  28
 5  AQUASMART: PRODUCTION BAND & RESERVOIR OUTLET METER  NRW / PROD / NET / M&E  RWS  TBA  TBA  TBA  4
 6  AQUASMART: BIG CUSTOMER METER  NRW / CS / M&E  RWS  TBA  TBA  TBA  30
 7  AQUASMART: NRW STOCK TRACKING SYSTEM  NRW  RWS  TBA  TBA  TBA  3
 8  AQUASMART: NRW JOB MANAGEMENT SYSTEM  NRW / NET / CS  RWS  TBA  TBA  TBA  26
 9  AQUASMART: SMART DMA  NRW  RWS  TBA  TBA  TBA             27
 10  AQUASMART: GUSSMAN RMS  NET / M&E  RWS  TBA  TBA  TBA         4
 11  AQUASMART: COMMERCIAL LOSS MONITORING SYSTEM  NRW / CS / NET  RWS  TBA  TBA  TBA  9
 MECHANICAL & ELECTRICAL ENGINEERING
 1  WORKSHOP ON ENMS DATA REPORTING  EXEC, TECH & CLERK, M&E  ENERGY MANAGER  46  2  1 DAY  10(G1)  2(G2)
 2  MEASUREMENT & CALIBRATION SYSTEM  EXEC M&E  SIRIM  42  2  TBA  4(G1)
                            18(G2)
 3  INSTRUMENT (FLOW METER, ANALYZER ETC)  EXEC M&E  EXTERNAL  43  2  TBA  3(G1)  18(G2)
 4  MECHANICAL (PUMP, VALVE, PIPES ETC)  EXEC & TECH M&E  EXTERNAL  42  2  TBA  21(G1)  20(G2)
 5  DOSING EQUIPMENT MAINTENANCE  EXEC M&E  EXTERNAL  42  2  TBA  18(G1)  24(G2)
 6  ELECTRICAL (MOTOR, MCCB, TRANSFORMER ETC)  EXEC M&E  EXTERNAL  43  2  TBA
 QUALITY MANAGEMENT
 1  DOCUMENT CONTROL PERSON   NEW DCP  QA  2 DAYS  16&17
 2  DOCUMENT CONTROL PERSON (REFRESHER)  DCP  QA  1 DAY  10
 3  ISO 9001:2015 QUALITY MANAGEMENT SYSTEMS (AWARENESS)  EXEC, TECH & CLERK  QA  30  1  0.5 DAY  3
 4  ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS   EXEC & ABOVE  SIRIM STS  TBA  1
 (AWARENESS)
 5  ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS    TECH, OP & CLERK  QA / HSE  0.5 DAY  23
 (AWARENESS)
 ISO 45001:2018 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEMS:
 6  INTERNAL AUDITING  AUDITOR  SIRIM STS  TBA  1
 7  ISO 50001:2018 ENERGY MANAGEMENT SYSTEM: INTERNAL AUDITING  AUDITOR  SIRIM STS  TBA  1
 ISO/IEC 27001:2013 INFORMATION SECURITY MANAGEMENT SYSTEMS
 8  IT / CS  IT  6  1  0.5 DAY                  22
 (AWARENESS)
 9  ISO/IEC 17025:2017 SKIM AKREDITASI MAKMAL MALAYSIA (AWARENESS)  WQ  EXTERNAL  0.5 DAY  22
 WATER QUALITY
 1  WATER SAMPLING PROCESS (REFRESHER)  ALL WQ STAFF  WQ  45  2  1 DAY  14(G1)
                  15(G2)
 2  WATER QUALITY CONTROL (REFRESHER)  ALL WQ STAFF  WQ  45  2  1 DAY  6(G1)
                       7(G2)
 3  WATER SAFETY PLAN (REFRESHER)  ALL WQ STAFF  WQ  45  2  1 DAY  8(G1)
                            9(G2)
 4  TECHNICAL EQUIPMENT AND WATER TESTING   WQ, M&E  ARACHEM  11  1  TBA  4
   203   204   205   206   207   208   209   210   211   212   213