3.2 Cold Room

The cold room will normally be purchased
directly by the franchisee for a Self-Build or
DPUK&I L for a corporate build, and supplied
and installed by a specialist sub-contractor.

The Shopfitting Contractor will be required to:
•	 provide normal attendance to the specialist

    sub- contractor and to coordinate the
    installation of the cold room into his works
    programme.
•	 ensure that the floor is flat and level and
    that the floor finishes are laid under the cold
    room prior to its installation
•	 provide a suitable ‘washing machine type’
    trapped waste on the nearest suitable drain
    run for the coldroom condensate. Where
    this is not possible, a condensate pump will
    be supplied and installed by the cold room
    manufacturer, but a suitable discharge
    point will still be required.

The coldroom must incorporate both an
emergency light and a brighter working light.
These will normally be supplied and installed by
the coldroom supplier.