         D5.5 Storerooms and Corridors                          D5.6 Corrals

         Where  extensions  or  alterations  to  store  rooms   External storage  space is often  restricted  at
         are  requested,  the  following  specifications        restaurants especially as freezers and chillers are
         should be used:                                        frequently extended into these spaces without
                                                                increasing  the  provision  for  bin storage.  The
         Floor                                                  construction  of existing corrals can vary from
         200x200mm Bianco a Carbo anti slip tiles from          modular units, traditional brick / block walls to
         Vogue  Ceramic.  4mm grout  joints,  anthracite.       simple timber enclosures. Unless advised to do
         No checquer plate should be used as flooring.          otherwise, extensions should mimic the existing
                                                                style and construction technique.
         150mm ceramic skirting tile for all walls prior to
         wall finishes beginning.                               Where corrals or bin stores are being raised to
                                                                the ground or built from new then the preferred
         Walls                                                  finishing materials are traditional brick or timber
         Decorated plasterboard; dulux ivory. Additional        effect trespa.
         mid and low level rail protection  or  hygienic
         cladding as kitchens.                                  Corral floors should be brushed concrete (laid
                                                                to falls to a gulley).
         Ceilings
         Often no ceiling finish. Alternatively satin spar as   All corrals require small power (for compactors
         kitchen specification.                                 and the like), and utility lighting.


         Doors                                                  A water stand pipe  is  also frequently required
         Solid core  with hardwood  lippings.  Balanced         to enable wash down which must be provided
         laminate                                               via a break tank.  Refer  to  CDM Partnership
         -  Entrance  door  to  be polyrey cream  to  the       performance specification for further details.
           outside  and  interior  concept  timber  finish  to
           insider face.                                        Where  waste compactors are  used, localised
         -  WC and change  doors to  be as public WC            smoke detection must be provided.
           doors  except where  facing into the crew
           room  which should be the  interior  concept
           timber finish.

         Ironmongery
         All ironmongery to SAA or stainless steel including;
         300mm kick  plates, D type  pull handle,  push
         plate, door  closer,  door  stop,  3 sets of  hinges,
         barrel lock (key operated to both sides).


         Shelving
         Shelving design and supply will be undertaken
         by Tardis. This should be coordinated  via the
         project manager.




          D5.5           Storerooms and Corridors            3.0                        09 February 2017
          D5.6           Corrals                             2.0                        23 June 2016
   162   163   164   165   166   167   168   169   170   171   172