Page 359 - B6118-AEW-XX-XX-PP-A-0001_(P16)_Contractors Manual
P. 359

CONSTRUCT













          C3.6 Wall Graphics

          Where  noted  on  the  architect’s drawings,          For natural integrity projects, walls must be lined
          graphics will be supplied and fitted by a named       with MR MDF to achieve a flush line of finishes
          specialist. During the detailed design phase, the     between wall graphics and tiles below.
          named graphic supplier should attend site with
          the principal contractor to assess the condition      The  graphic  media is digitally printed  wall
          of all existing walls and to advise on any require    vinyl which is installed as any other  wall vinyl.
          preparatory works from the following measures:        Wall  ‘sizing’  or  sealing  as  graphics  supplier
                                                                recommendations.
          •  Retain  existing  wall  finish  ready  to  receive   Whilst installing  the  wall  graphics  to  the  dining
              new wall vinyl directly.                          area and staff room  walls, the  nominated
          •  Remove  part  existing  finishes  and  patch       graphics company will also install a transfer that
              repair ready to receive new wall vinyl.           reads ‘crew information’ to the white laminated
          •  Remove all existing finishes and provide new       wall in the staff area.
              substrate (MDF or plasterboard)  ready to
              receive new vinyl.

















































           C3.6           Wall Graphics                       2.0                        23 June 2016
   354   355   356   357   358   359   360   361   362   363   364