Page 385 - B6118-AEW-XX-XX-PP-A-0001_(P16)_Contractors Manual
P. 385

CONSTRUCT


















          C3.21 Counter Ceiling Raft; New

          Where existing MDF counter rafts are not present       The new raft should project 50mm below the
          a new raft should be provided to the details set       dining  area  ceiling  line  unless  specifically  set
          out below.                                             out on the site specific architects drawings. The
                                                                 new raft should be solid for the full width and
                                                                 depth of the counter opening. The raft should
                                                                 be decorated white throughout.




























































           C3.21          Counter Ceiling Raft; New            3.0                       23 June 2016
   380   381   382   383   384   385   386   387   388   389   390